VD2: 10/14/14
Page 2 of 24
BMK1.5 LN Boiler 24-Month Maintenance Kit #58025-05 Instructions
Technical Instruction Document
TID-0066_0B
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, New York 10913
•
Phone: 800-526-0288
TABLE OF CONTENTS
INTRODUCTION ................................................................................ 3
CONTENTS OF 24-MONTH MAINTENANCE KIT .............................. 3
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED ............... 3
PRELIMINARY INSPECTION PROCEDURES .................................... 4
WATERSIDE INSPECTION OF THE HEAT EXCHANGER .................. 5
FIRESIDE INSPECTIONS & COMPONENT REPLACEMENT ............. 7
Exhaust Manifold Maintenance .................................................................... 15
Exhaust Manifold Disassembly and Inspection .................................................... 15
Condensate Trap Component Replacement .......................................................... 17
Replacing the LWCO Probe/Capacitor Assembly ...................................... 20
Low Water Cutoff (LWCO) Capacitor Integrity Test .......................................... 20
FINAL REASSEMBLY AND TESTING .............................................. 23
Set-Up and Reassembly After Maintenance ............................................... 23
Disclaimer
The information contained in this manual is subject to change without notice from
AERCO International, Inc. AERCO makes no warranty of any kind with respect to this
material, including, but not limited to, implied warranties of merchantability and fitness for
a particular application. AERCO International is not liable for errors appearing in this
manual. Nor for incidental or consequential damages occurring in connection with the
furnishing, performance, or use of this material.
Technical Support:
(Mon–Fri, 8am-5pm EST)
1-800-526-0288
www.aerco.com