background image

Min. 12"

2

Indoor Installation

For indoor installations, it is important that the assembly be easily 
accessible to facilitate testing and servicing. If it is located in a line 
close to wall, be sure the test cocks are easily accessible. A drain 
line and air gap should be piped from the relief valve connection as 
shown, where evidence of discharge will be clearly visible and so 
that water damage will not occur. Therefore, never install in con-
cealed locations.

Outside, Above Ground Installation

NOTICE

Must take precaution to protect against freezing. Temperatures 
below 32°F can lead to damage or property loss. 

In areas where freezing conditions do not occur, Series 995 can 
be installed outside. The most satisfactory installation is above 
ground.
In areas where freezing conditions can occur, Series 995 should 
be installed above ground in an insulated enclosure.
Series 995 must be installed in an accessible location to facilitate 
testing and servicing. A discharge line should be piped from the 
air gap at the relief valve connection making sure that there is ade-
quate drainage. Never pipe the discharge line directly into a drain-
age ditch, sewer or sump. Series 995 should never be installed 
where any part of the unit could become submerged in standing 
water. 
Backflow preventers should never be placed in pits unless 
approved by local codes. In such cases, a modified pit installation 
is preferred.

Parallel Installation

Two or more smaller size assemblies can be piped in paral-
lel (when approved) to serve a large supply pipe main. This type 
of installation is employed where increased capacity is needed 
beyond that provided by a single valve and permits testing or 
servicing of an individual valve without shutting down the line com-
pletely.
The number of assemblies used in parallel should be determined 
by the engineer's judgement based on the operating conditions of 
a specific installation.
For parallel valve installations, the total capacity of the assemblies 
should equal or exceed that required by the system.

Basic Installation Instructions

1

2

" - 2" (15 - 50mm)

Meter

Strainer

Indoor Installation

1" Watts 995QT 
with Air Gap

W

W

12"

Outdoor Installation

Indoor Installation

Watts 995QT

Now available. WattsBox Insulated Enclosures,  

for more information, send for ES-WB or ES-WB-T.

995QTS

WattsBox

Summary of Contents for 995 Series

Page 1: ...lding or plumbing codes may require modi ca tions to the information provided You are required to consult the local building and plumbing codes prior to installation If the information provided here i...

Page 2: ...at there is ade quate drainage Never pipe the discharge line directly into a drain age ditch sewer or sump Series 995 should never be installed where any part of the unit could become submerged in sta...

Page 3: ...eck valve and clean thoroughly NOTICE Periodic relief valve discharge may occur on dead end service applications such as boiler feed lines or cooling tower makeup lines due to fluctuating supply press...

Page 4: ...ng the white washer counter clockwise 6 To reassemble the relief valve press the seat firmly into place in the body snap the spring onto the relief valve stem cen ter the spring on the seat and insert...

Page 5: ...rst check assembly rotate the check module by hand counterclockwise 3 The second check assembly is removed by inserting the blade of a screwdriver into two opposing slots of the seat as shown in Figur...

Page 6: ...quipment and open No 2 shutoff valve of the device Test No 1 Check Valve No 2 Purpose To test check valve No 2 for tightness against reverse flow Requirements Valve must be tight against reverse flow...

Page 7: ...7 Notes...

Page 8: ...es delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no control This warranty shall be...