Add-on Monitoring Connection Kits

 

ORDERING CODE

ADD-ON/REPLACEMENT KIT

DESCRIPTION

88003067

BF-BMS-MCK 

BMS Monitoring Connection Kit 

Series LF007 Model IOT  

Sizes 2½" to 3"

Includes a turnkey solution for transmitting valve 

assembly pressure measurements to a building 

management system; consists of an interface  

module with three (3) sensor cables, data cable, 

and power adapter.

88003068

RK-BF-Sensors 

Pressure Sensor Module  

Replacement Kit 

Series LF007 Model IOT  

Sizes 2½" to 3"

Includes three (3) replacement pressure sensor 

modules for installation on test cocks No. 2, No. 3, 

and No. 4.

Summary of Contents for 007 Series

Page 1: ...lding or plumbing codes the local codes should be followed This product must be installed by a licensed contractor in accordance with local codes and ordinances WARNING Need for Periodic Inspection Ma...

Page 2: ...assembly or the shutoff valves have been operated Certified testers of backflow assemblies must conduct this test The trim valves of the detector meter bypass line on assemblies so equipped should be...

Page 3: ...007M1 sizes 3 4 1 and Series 007M2 3 4 have interchangeable seats and springs 2 The check seats are attached to the cage with a bayonet type locking arrangement Holding the cage in one hand push the...

Page 4: ...ed testers of backflow assemblies must conduct this test The trim valves of the detector meter bypass line on assem blies so equipped should be shutoff during the confirming flow test When the test is...

Page 5: ...ist PL RP BPD 5 Reassemble the check valve modules Check modules are installed in the valve body with the seats facing the valve inlet The modules must be securely in place before the retainer can be...

Page 6: ...ey solution for transmitting valve assembly pressure measurements to a building management system consists of an interface module with three 3 sensor cables data cable and power adapter 88003068 RK BF...

Page 7: ..._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Page 8: ...perty which is damaged if this product does not work properly other costs resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditio...