Watts Industries FlowBox Solar 8010 Installation Instructions Manual Download Page 3

Installation instructions

 

GB

 

FlowBox Solar 8010  

 

EDP No. 10019552 (7011900) 
Last revised: 17/09/2012 
Subject to technical modifications 

 

 

 

IMPORTANT! 
- Before commencing work, the installer must read, understand and observe this installation and operating manual. 
- The solar stations are only to be assembled, installed and maintained by trained professionals. Personnel in training are only to work with the product 

under supervision of an experienced professional. Only under the above mentioned conditions does the manufacturer accept any liability according 
to the legal stipulations. 

- All instructions in this installation and operating manual are to be observed when using the solar station. Any other mode of usage is inappropriate. 

The manufacturer accepts no liability for damage caused by inappropriate use of the solar station. Rebuilding, or making alterations, is prohibited for 
safety reasons. The solar station is only to be repaired by a repair service named by the manufacturer. 

-The respective components delivered with the device vary according to type and equipment. Subject to technical modifications without notice! 

 

 
 

Wall mounting

 

 

 

(1) 

 

 

(4) 

 

(3) 

 

 
 

(2) 

(5) 

 

 
 

Version with supply 
tube and controller 

Version with 
air-vent tube 

Version with 
supply tub

 

 

 

(Fig. 1)

 

Version with air-vent tube 
and controller 

 

 
 
 

 

Mounting (Fig. 1) 

 

-- Remove front insulation cover (5). 
- The solar station (1) forms a unit with the wall bracket and the rear 

insulation cover, and is to be fastened from the front side, in the 
prescribed position, with wall plugs and screws (2) suitable for the 
subsurface. 

 

-   Connect the safety assembly (3) (supplied separately with the module) 

to the outlet of the return flow fitting (4) above the pump using the 
G 3/4"  union nut. The package accompanying the module contains 
a suitable gasket. 

 

-   Mount the wall bracket for the expansion tank at the side of the module. 

Ensure that the corrugated hose is long enough for connection 
of the expansion coupling and the 3/4” male thread of the safety 
assembly! 

 

-   Connect the system up to the solar energy circuit. 

 

-   After the system has been filled and a complete seal-tightness 

check performed, attach the front section of the heat insulation. 

 

-   Removing  the module  from  the wall  bracket:  use a screwdriver or 

similar tool to pull the clamping rings off towards you. 
N.B.: the FlowBox  Solar  module  is  now  loose!  Make sure  that  it 
does  not  slide  forwards and out  of  the wall  bracket! 

Mounting the  clamping ring  screw  connections 

 

-   Cut off the copper pipe at a right angle using a pipe cutter and debur 

the edges of the pipe. 

-   First push the clamping ring nut over the pipe, then the clamping ring. 
-   Insert the pipe with clamping ring nut and clamping ring into the screw 

connection and push up to the stop. 

-   Tighten the clamping ring nut by hand.- 
-   When tightening the compression fitting, care is to be taken that 

counter-pressure is applied to the respective designated panes with 
an open-ended spanner. 

 

 

Connection  safety  valve 

 

-   A blower line leading to a collection container (e.g. empty canister of 

the solar heating medium) must be fitted to the safety valve. This 
permits collection and reuse of any heating medium which escapes 
in the event of malfunction. 

 

 

Heat insulation cladding 

 

-   The heat insulation cladding is for thermal insulation and protection 

during transport. 

 

 

Connection plug  for  filling, flushing and draining 

 

-   Both the safety assembly and the FlowGuard are fitted with a mini 

ball-valve for filling, flushing and draining the system. 

 

 

Safety  assembly 

 

-   Consisting of safety valve, pressure gauge, fill-and-drain valve, and an 

expansion tank connection. In order to reduce the thermal load, the 
safety assembly is installed in the return flow line. 

Summary of Contents for FlowBox Solar 8010

Page 1: ...t mit dem Wandhalter und der hinteren Isolierschale eine Einheit und wird komplett von vorne an der daf r vorgesehenen Stelle mit f r den Untergrund geeigneten D beln und Schrauben 2 befestigt Die Sic...

Page 2: ...derlich sein Technische Daten Armaturen Pressmessing Ms58 Rohrstr nge Pr zissionsrohre Durchflussmesser hochwertige schlagz he und temperaturfeste Kunststoffe Feder Durchflussmesser rostfreier Stahl W...

Page 3: ...g the module contains a suitable gasket Mount the wall bracket for the expansion tank at the side of the module Ensure that the corrugated hose is long enough for connection of the expansion coupling...

Page 4: ...data Fittings hot pressed brass Ms58 Pipe systems precision pipes Flowmeter high grade impact proof and temperature resistant plastic Spring flowmeter stainless steel Heat insulation cladding EPP Mat...

Page 5: ...s pr vues cet effet Enlevez la coque isolante 5 La station solaire 1 qui forme une unit avec le support mural et l enveloppe calorifuge arri re est enti rement fix e l avant l emplacement pr vu l aide...

Page 6: ...res plastiques hautement r silientes et r sistantes aux variations de temp ratures D bitm tre ressort acier inoxydable Enveloppe calorifuge PPE Mat riel Temp rature de service max Admissible voir le...

Page 7: ...e posteriore e viene fissata dal davanti sul punto previsto per il montaggio con i tasselli e le viti 2 adatti al fondo Accertare che non sia possibile estrarre con facilit la stazione solare dal supp...

Page 8: ...ndotte Tubi di precisione Misuratore di portata Materie plastiche di alta qualit resistenti agli urti e alle temperature elevate Molla misuratore di portata Acciaio inossidabile Strato di isolamento t...

Page 9: ...puntos correspondientes en la parte delantera con tacos y los tornillos 2 adecuados Aseg rese de que no sea posible retirar la estaci n simplemente tirando de ella Desmontaje ver m s abajo Conecte el...

Page 10: ...ta calidad resistente a los golpes y al calor Muelle del caudal metro acero inoxidable C psula termoaislante EPP polipropileno expandido Materiales Temperatura de servicio m x adm v ase diagrama de pr...

Page 11: ...mb m a respectiva compacta o O fixador de parede para o recipiente ampliat rio monta se de lado da esta o solar Procure que o comprimento da mangueira gofrada seja suficiente para ligar a jun o do rec...

Page 12: ...4 liga o de tubos 35 Nm 1 liga o de tubos 55 Nm 11 4 liga o de tubos 90 Nm 11 2 liga o de tubos 130 Nm Dada a reac o da compacta o pode ser necess rio o investidor apertar ainda mais as liga es dos t...

Page 13: ...er isolatiekap aan de voorzijde 5 De solar unit 1 vormt een eenheid met de muurbeugel en de isolatiekap aan de achterzijde en moet worden bevestigd vanaf de voorkant in de aangegeven positie met plugg...

Page 14: ...aseerd op de berekeningen voor het systeem Fig 2 L min Materiaal gegevens Fittingen messing MS58 Debietmeter slagvast en hittebestendig kunststof Veer inregelventiel Roestvrij staal isolatieschaal EPP...

Page 15: ...5 Nm ewentualnie doci gn Zdj przedni wk adk izolacyjn 5 Stacja solarna 1 stanowi jeden podzesp z uchwytem ciennym i tyln wk adk izolacyjn i jest montowana w komplecie od przodu w przewidzianym dla nie...

Page 16: ...wa sztuczne odporne na temperatur Spr yna przep ywomierza stal nierdzewna Pow oka termoizolacyjna EPP Materia y Maks dop temperatura robocza patrz wykres zale no ci ci nienia od temperatury Min dop te...

Page 17: ......

Reviews: