
24
Need help or have any questions? Call us at 1-714-963-0329 or send us an email to [email protected]
❑
Place the tail wheel bracket onto the bottom of the
fuselage. To align the assembly, the tail wheel tiller arm should
fit down into the slot you cut in the rudder, the pivot point of
the tiller arm should be even with the rudder hinge line and
the bracket should be centered in the middle of the fuselage.
☞
You will need to cut a small notch in the leading edge of
the rudder for the tiller arm boss.
❑
When satisfied with the alignment, remove the tail wheel assembly and apply a couple of drops of lightweight oil or
Vaseline to only the pivot point of the tiller arm.
❑
Mix a small a small quantity of 5 minute epoxy and use it to glue
only
the tiller arm into the bottom of the rudder. Before
the epoxy sets up, carefully secure the plastic bracket to the fuselage using the two 2mm x 5mm wood screws provided.
☞
Make small pilot holes for the wood screws using a 1/16" drill bit.
❑
# 1 Phillips Head Screwdriver
❑
Electric or Hand Drill
❑
1/16" & 5/16" Drill Bits
❑
Ruler
YOU'LL NEED THE FOLLOWING PARTS:
❑
(1) Fiberglass Cowling
❑
(1) 370 Size Motor w/Gear Box
SECTION 9: GEAR BOX & COWLING INSTALLATION
❑
(3) 2.5mm x 12mm Wood Screws
❑
(2) 2.5mm x 5mm Wood Screws
YOU'LL NEED THE FOLLOWING TOOLS AND SUPPLIES:
❑
Pencil
❑
Masking Tape
❑
220 Grit Sandpaper w/Sanding Block
❑
Rotary Tool w/Sanding Drum
❑
Using a ruler and pencil, draw a vertical centerline on the
front of the motor plate.
Step 1: Installing the Gear Box Assembly