![Watson Marlow Pumps 530 Series Operating Manual Download Page 21](http://html2.mh-extra.com/html/watson-marlow-pumps/530-series/530-series_operating-manual_3763085021.webp)
12
Start-up check list
Note
: See also Tube loading.
o
Ensure that proper connections are achieved between the pump and suction and discharge piping.
o
Ensure proper connection has been made to a suitable power supply.
o
Ensure that the recommendations in the section
"Good pump installation practice" on page 15
are followed.
m-530sn-gb-02
21