
To prepare for fraction and waste collection:
1. Inspect the fraction collection tubes and collection bed layout, to verify the
module is ready to receive the run's fractions and waste.
2. Inspect the waste container, to ensure it can collect waste.
See also:
Waters Fraction Collector III Operator's Guide
.
Verifying operational readiness
Optionally, run an instrument method using the Monitor control, to set initial
conditions and verify the system's operational readiness.
Tip:
You can view real-time status and plots in the ChromScope System Panel and
Current Run tabs, to monitor flow and detector baselines.
For more information, see these topics in the ChromScope online Help:
l
Configure system and module settings
l
Determine system status
l
Maintain the 2545 Binary Gradient Module
l
Create methods for controlling system functions
12
August 8, 2014, 715003940 Rev. B
Prep 150 LC System