background image

Unpackaging...

Step 1

Carefully remove the box from the wooden crate 
ensure you are extra careful when dismantling the 
wooden crate. Lift the box carefully over the top of the 
bath.

Carefully unwrap all the shrink wrap and foam 
protection from around the bath. Remove all 
packaging from the working area.

1,

www.

watersbaths

.co.uk

8mm Self Drill
Screws x2

8mm Self Drill
Screws x2

8mm Self Drill
Screws x2

Summary of Contents for Elements Matt

Page 1: ...Elements Matt Fitting Instructions ...

Page 2: ... ensure that your plumbing system is adequate and that you have sufficient space to complete the installation Please Note We recommend that you employ a suitably qualified plumbing professional to complete the installation of your new bath We can not accept responsibility for poor or incorrect installation Please keep these instructions in a safe place for future reference Seb Waters www watersbat...

Page 3: ...en dismantling the wooden crate Lift the box carefully over the top of the bath Carefully unwrap all the shrink wrap and foam protection from around the bath Remove all packaging from the working area 1 www watersbaths co uk 8mm Self Drill Screws x2 8mm Self Drill Screws x2 8mm Self Drill Screws x2 ...

Page 4: ...ertaking installation For biggest impact we suggest that bath is located a minimum of 150mm away from any wall Locate the bath in its intended position and draw around the lower outer edge and mark the waste location with a pencil Access to the waste and any isolation valves should be considered 3 150mm 150mm 150mm Wall 2 ...

Page 5: ...a large spirit level to check that it is level on both the horizontal and vertical plains Only if the bath is level will all the water drain to the waste outlet Ensure you allow for any variation of the floor surface and that the bath has been levelled in its intended final location 4 ...

Page 6: ...orking access for you to connect the waste to the underside of the bath Please be careful the bath is secure as to not hurt yourself or damage the bath Once tight add silicone remove the blocks and lower the bath into position ensuring that the pipe work is not damaged 5 www watersbaths co uk Remember you do not need to fit your bath directly over the soil pipe It can be positioned anywhere within...

Page 7: ... plumbing system by adding water and ensuring it drains away adequately leaving no puddles and that there are no leaks Once checked half fill the bath to ballast it before securing it to the floor Apply silicone adhesive evenly between the base of the bath and the floor filling the 1 2mm gap 10 12 Hours 6 ...

Page 8: ...riting to our office within 10 days of the problem being apparent Any claim is by the original purchaser this guarantee is not transferable The product has been used in the manner that it was intended this protection does not apply to any products that have been misused in any way The product must have been installed and cared for in line with our Installation and care instructions See Installatio...

Page 9: ...following the stain instructions or by lightly sanding the area with the super fine wet and dry paper supplied in the care kit Deep scratches and chips can be repaired and your bath entirely resurfaced by factory trained staff bringing your bath back to as new condition Please contact us for information about these services Bathing with bath bombs and coloured oil s may leave residue if they are l...

Page 10: ...www watersbaths co uk Notes Drawings ...

Page 11: ...www watersbaths co uk Notes Drawings ...

Page 12: ...www watersbaths co uk Lawns Farm Long Lane Dalbury Lees Ashbourne Derbyshire DE6 5BG t 01332 824166 e info watersbaths co uk ...

Reviews: