
Right Release Lever
Left Release Lever
• Empty the drawer.
• Fully extend the drawer.
REMOVING DRAWERS
• Push the lever on the right slide down, lift the lever on
the left side up. Pull out drawer to remove.
• Attach the top to the unit using (3) #14-10x3/4" screws
and (3) 1/4" washers. Be sure the individual tops are
snug against each other.
• Complete top attachment using (4) #14-10x3/4" screws
and (4) 1/4" washers.
• Insert plug into hole in the plastic top. NOTE: To use this
hole for cord management, remove the center portion of
the plug before installing.
• Place wood top on the plastic top.
Remove
3
OPERATION
slide carrier
slide
Ball bearing slide - Pull slides and slide carrier out to fully
extended position (see illustration.) Hold the slide on the
cabinet while aligning it with the slide on drawer. Slightly
insert one side and repeat for the other side. Slowly push
drawer to its fully closed position to engage slide. Open
drawer and reclose to ensure proper operation.
INSTALLING DRAWERS