
1/4" Washers (Qty: 7)
#14-10x3/4" Screws (Qty: 7)
Plug (Qty: 1)
Screw
Nut
HARDWARE INCLUDED:
CASTER INSTALLATION
TOOLS REQUIRED:
3/8-in Wrench
7/16-in Wrench
Cross-tip Screwdriver
Items Needed:
1/4 - 20 x 5/8” Screw (Qty: 16)
1/4 - 20 Nut (Qty: 16)
3/8-in Wrench
7/16-in Wrench
PLASTIC TOP INSTALLATION
Items Needed:
#14-10x3/4" Screws (Qty: 7)
1/4" Washers (Qty: 7)
Plug (Qty: 1)
Cross-tip Screwdriver
Process:
• Slide the two plastic top pieces together and place on the
unit.
Process:
NOTE: Use adequate personnel for this operation.
• Remove the bottom drawer by following the drawer
removal instructions in the operations section.
• Lay the cabinet on its back. Use packaging material to
protect the finish.
• Attach the casters using (4) screws and (4) nuts per
caster. Mount both swivel casters on the same side of
the unit as the side handle.
• Wrench tighten all screws
• Return the unit to its upright position.
• Reinstall bottom drawers.
1/4 - 20 Nut (Qty: 16)
1/4 - 20 x 5/8" Screw (Qty: 16)
2
ASSEMBLY
HARDWARE