13
Automatic Hard Water Bypass During Regeneration
The regeneration cycle can last 30 to 180 minutes, after which soft water service will be re-
stored. During regeneration, hard water is automatically bypassed for use in the household.
Hot water should be used as little as possible during this time to prevent hard water from
filling the water heater. This is why automatic regeneration is set for sometime during the
night and manual regenerations should be performed when little or no water will be used in
the household.
Normal regeneration time is 2:00 AM.
When the system capacity is near exhausted, a regeneration is necessary to restore the sys-
tem to full capacity. The table below explains the regeneration steps.
Precision Brining Regeneration Process
System Configuration
Step
Name
Descrip on
#1
Brine
Making
A
precise
calculated
amount
of
fresh
water
is
added
to
the
brine
tank
to
make
enough
brine
to
regenerate
only
the
exhausted
por on
of
the
ion
exchange
resin.
Note:
70%
of
the
required
fresh
water
is
added
in
Step
#5
in
the
previ
‐
ous
regenera on.
The
default
brine
making
me
is
30
minutes.
#2
Brine
The
brine
solu on
is
introduced
slowly
to
the
bo om
of
the
tank
fl
owing
up
through
the
ion
exchange
resin
pushing
the
hardness
out
to
drain
and
restor
‐
ing
system
capacity.
#3
Back
Wash
Fresh
water
is
introduced
to
the
bo om
of
the
tank
fl
owing
upwards
expand
‐
ing
the
ion
exchange
resin
to
rinse
out
any
dirt
or
small
par cles
to
the
drain
and
to
un
‐
compact
the
bed
to
restore
full
service
fl
ow
rates.
#4
Rinse
Fresh
water
is
introduced
from
the
top
of
the
tank
down
fl
owing
down
through
the
ion
exchange
resin
rinsing
any
excess
brine
solu on
out
to
the
drain.
#5
Re
fi
ll
A
fi
xed
amount
of
so
water
is
added
to
the
salt
tank
to
prepare
and
insure
fully
saturated
brine
for
the
next
regenera on.
Note:
Step
#1
will
"top
o
ff
"
the
amount
of
water
needed
based
on
the
percentage
of
exhausted
resin
to
be
regenerated.
185HE
UPFLOW
System
Con
fi
gura on
Tank
Size
(Diameter)
Injector
Set
Brine
Line
Flow
Control
(BLFC)
Drain
Line
Flow
Control
(DLFC)
8"
#0000
Black
0.20
GPM
#1
(1.5
GPM)
9"
#2
(2.0
GPM)
10"
#3
(2.4
GPM)
12"
#00
Purple
#5
(3.5
GPM)
13"
#0
Red
#6
(4.0
GPM)
14"
#1
WHITE
#A
(5.0
GPM)
Summary of Contents for 185HEDP
Page 7: ...7 Installation...
Page 19: ...19 Main Repair Parts Connectors A A A B D F E A C...
Page 22: ...22 Power Head Exploded View...
Page 24: ...24 Trouble Shooting...