Refer Joey re chart image
Table
4: Custom
Schedule
6.4 Running Waterco ECO-V 150 from Keypad
Caution:
If power is connected to the Waterco ECO-V 150 motor, pressing any of
the following buttons referred to in this section 6.4 could result in the motor starting.
Failure to recognize this could result in personal injury or damage to equipment.
1. Press the START key and the Waterco ECO-V 150 will run the programmed 24
hour duration schedule. The START event will be stored in the controller. Should a
power outage occur, the Waterco ECO-V 150 will automatically re-start at STEP 1
when power is restored.
2. The Waterco ECO-V 150 will always run the PRIMING sequence when it starts
from the OFF state, including when it automatically restarts following a power
outage. The default Prime setting is defined in the “Priming” section of this
document.
3. The Waterco ECO-V 150 then starts running in STEP 1 at the programmed
DURATION and SPEED. The “ACTIVE LED” for STEP 1 will turn ON. The
DURATION and SPEED setting LEDs along with the respective bar graph LED will
blink back and forth every three (3) seconds.
Refer Joey re chart image
Summary of Contents for Hydrostorm ECO-V 150
Page 29: ......