4
Driven Point Installation-Figure 2
1. Connect suction pipe to drive point (Fig. 2).
Keep horizontal pipe run as short as possible.
Use Teflon tape on male pipe threads. Multiple
well points may be necessary to provide
sufficient water to pump.
2. Install check valve in horizontal pipe. Flow
arrow on check valve must point toward pump.
Surface Water Applications- Figure 3A and 3B
A. Vertical from Surface Water to Pump.
1. Foot Valve with Strainer attached to PVC pipe.
2. Install check valve in horizontal pipe.
B. Horizontal from Surface Water to Pump
1. Attach Foot Valve to PVC pipe
2. Next attach the Strainer Basket to Foot Valve
3. Install check valve in horizontal pipe.
Figure 2
Driven point installation,
multiple well points
To sprinkler
heads
Discharge pipe
Gate valve
Gate valve
To sprinkler heads
Check
valve
INSTALLATION
Multiple
well heads
Check
Valve
Strainer Basket
Foot Valve
with Strainer
Figure 3A - Vertical
Figure 3B - Horizontal
Summary of Contents for WA10PLS
Page 8: ...WA10PLS WA15PLS WA20PLS ...