Integration Box Relay 11 Normally Open Jumped to Integration Box Relay 16 Normally Open
Integration Box Relay 4 Normally Open Jumped to Integration Box Relay 16 Common
The purpose of the last 2 connections that are jumps inside the integration box is to allow washify to
control the “Roller” button on ICS with 1 relay (Relay 16).
Summary of Contents for MOXA
Page 3: ...Step 1 1 Mount Metal mounting fins onto the enclosure with provided bolts...
Page 4: ...Step 1 2 Mount Box to wall using lag bolts or required hardware for wall type...
Page 5: ...Step 1 3 Verify Mounting is flush and will not fall...
Page 8: ...Step 2 3 Once the cable is inside the box screw the cap back on the fitting and tighten...
Page 10: ...Step 2 6 Insert the crimped RJ45 end into Port 1 on the Moxa box shown below...
Page 13: ...Black Line White Neutral Green Ground...
Page 16: ...Check the next page for a photograph of the terminal strip connected...
Page 17: ......