Wärtsilä JOVYSTAR
– DELTA 40 – 150kVA BAX 4647E - 12 -
3
Installation
3.1
Reception
After reception of the UPS, unpack immediately and carry-out an accurate visual check for any transport-damages.
i
IMPORTANT:
In case of objections relating to damage incurred during transport these must be immediately notified to
the transportation company after reception of the product.
When the UPS is not installed immediately it must be stored carefully in vertical position, as indicated on
the packing and conserved in a dry and sheltered room in its box so that it is protected from dust.
3.2
Transport
Before positioning the UPS, in order to avoid risks of turnover, it is recommended to move the system only while mount-
ed on the wood pallet. Before the positioning in the final location, remove the pallet from the UPS. The UPS can be lifted
and handled using a pallet truck or a forklift.
3.2.1
Setting Up and Installation
The UPS must be installed in a clean and dry room, preferably not dusty. The user must ensure a proper air conditioning
for cooling the equipment. If the UPS contains the batteries internally the air exchange with the external ambient must
comply with EN 62040, annex N.
3.2.2
Ground Plan
Ground Plan
Designation
40-60kVA
|
80-150kVA
L1 - mm
660
| 775
P1 - mm
825
| 750
L2 - mm
50
| 100
L2
P1
L1