9. How to operate the machine
1. Switch on the main switch for input supply provided for the machine
2. Switch on the MCB of the machine provided on the rear side of the machine
3. Set the output current as per required welding rod from panel or through remote
4. Start welding on the plate or job. Adjust the welding current as per requirement.
5. Switch off the machine when welding is over.
6. Switch off the main switch.
Summary of Contents for INARC-400 I
Page 15: ...6 INSTALLATION DIAGRAM OF INARC 400 I ...
Page 22: ...12 Wiring Diagram ...
Page 25: ...SPARE PARTS IN DETAILS TOP VIEW SIDE VIEW LEFT ...
Page 26: ...SIDE VIEW RIGHT FRONT VIEW 1 ...
Page 27: ...FRONT VIEW 2 ...