Warner Shelter Systems Limited
PAGE 5
* Corners are numbered here for ease of explanation only.
• Place the Tent Top midway along one side and
unfold fabric toward the corners.
* Ensure that centre socket pulls out towards the tent
centre, if not rotate entire Tent Top bundle 180°.
• Pull centre socket, towards the centre.
• Attach webbing 1 & 2 to corresponding corners as
shown in
STEP 8A
below.
• Pull upper layer towards the 3rd corner. Avoid
stepping on Tent Top.
• Repeat to 4th corner.
• Attach webbings 3 & 4 to corresponding corners.
SEE STEP 8B
below.
1
2
Step 8
Step 6
•
If Sliding Walls are to be installed
, attach the Cable for
Slide Wall 20 to the Corners and tighten turnbuckle.
Step 7
• Unfold Drop Sheet (not included) 19 over
the Cross Cables to protect the Tent Top and
to keep the Tent Top clean.
1
2
Centre Socket
1
2
1
2
4
3
1
2
3
4
TENT TOP INSTALLATION
PROTECTING THE TENT TOP
Step 8A
• Attach one corner of the Tent Top to the frame
by pulling handle B to place loop webbing A
under the corner loop C .
C
B
A
• Attach as in 8A, but if tight, insert a
stake through webbing A and press
down and under until the webbing slips
under the corner loop C .
ATTACHING THE LAST
Step 8B
Turnbuckle
Cable: Slide Wall
ATTACHING WEBBING TO CORNER LOOP
Drop Sheet
Cross
Cable
C
A
..\graphicshome\marquee\manuals\MQ 20\MQ20H Manual 2009.pdf
(NOT INCLUDED)