Installation step 3
Once the floor has been marked up, the space
heating cable can be laid out. Test heater
throughout installation.
Gently pull the unheated lead from the box.
Do not
remove the spool from the box as this will cause the
space heating cable to twist.
After 9 feet of cable has been removed, you will reach the
point at which the unheated lead joins the space heating
cable.
The joint should be taped to the floor at the start point.
Ensure that the factory joint lays flat on the floor. Care
should be taken to ensure that the factory joint remains
horizontal, and within the area to be tiled. The joint should
not be bent at point of entry into the conduit as this may
damage both the factory joint and /or the heating element
within.
The space heating cable should be laid in parallel lines back
and forth across the main body of the area to be heated.
Using the cable spacing markings as tape down points,
secure the space heating cable to the floor with strips of
adhesive tape supplied.
The strips should be about 1 inch long.
A
Lay space heating cable out from
start point
B
Lay out space heating cable in
parallel lines
C
Space and secure with fixing tape
D
Tape down end point.
19
Summary of Contents for USDW360
Page 9: ...9 Making electrical provision for the heater ...
Page 10: ...10 Heater Information ...
Page 11: ...11 ...
Page 14: ...Wiring configurations 14 ...
Page 26: ...26 NOTES ...
Page 28: ......