background image

16 December 2014 

Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification. 

All Dimension are in mm……. Copyright on all products and Specifications © 

 

15 

GENERAL NOTES : ASNZS 2918 : 2001

 

NOTES: 

 

 

For the fire operational and Maintenance instructions visit 

www.warmington.co.nz 

and up load the PDF.

 

 

 

Correct Installation must be maintained to comply with Warmington Warranty's. 

 

 

 

The Appliance and Flue System must be installed in accordance with ASNZS2918:2001 and the appropriate  Building 

codes.

 

 

 

The Flue system and fireplace is to be swept annually or more frequently if required.

 

WARNINGS: 

 

 

WARNING; ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN 

WRITING BY THE TESTING AUTHORITY IS CONSIDERED AS BREACHING AS/NZS 4013. 

 

 

WARNING; DO NOT USE FLAMMABLE LIQUIDS OR AEROSOLS TO START OR REKINDLE THE 

FIRE.

 

 

 

WARNING; DO NOT USE FLAMMABLE LIQUIDS OR AEROSOLS IN THE VICINITY OF THIS 

APPLIANCE WHEN IT IS OPERATING.

 

 

 

WARNING; DO NOT STORE FUEL WITHIN HEATER INSTALLATION CLEARANCES.

 

 

 

WARNING;  WHEN OPERATION THIS APPLIANCE AS AN OPEN FIRE USE A SPARK SCREEN.

 

 

 

CAUTION

:  THIS APPLIANCE SHOULD BE MAINTAINED AND OPERATED AT ALL TIMES IN 

ACCORDANCE WITH THESE INSTRUCTIONS

 

 

 

CAUTION

: THE USE OF SOME TYPES OF PRESERVATIVE-TREATED WOOD AS A FUEL CAN BE 

HAZARDOUS.

 

 

Industries 1994 LTD 

PO Box 58652, Botany 2163, Auckland 

www.warmington.co.nz

 

 

NOTE: For Operation Instruction download from the website 

www.warmington.co.nz

 

IMPORTANT NOTE : TREATMENT OF  COOKING SURFACES BEFORE USE .

 

 

BURN OFF : 

  

 

Before cooking on the plate or grill for the first time , burn off any residual oils or foreign matter by lighting or igniting the Fire or 
Burner . 

 

ENSURE THAT THE  OUTDOOR FIRE  IS WELL VENTILATED WHEN LIGHTING FOR THE FIRST TIME , &   operate 
Fire on high for up to 5 minutes . 

 

Cooking may proceed after the surface has been carefully wiped down with a cloth or paper towel . 

 

 

PREHEATING : 

 

 

It is necessary to preheat for a short time before cooking certain foods , depending on the type of food & the cooking temperature .   

Summary of Contents for Nouveau Pizzeria SN1250 Double Flue

Page 1: ...ns for further reference Ensure that you have the correct and current Installation details for the Warmington Fire Installation The Warmington unit is to be Installed by a Certified Warmington Install...

Page 2: ...ce To be maintained to the manufactures Instructions Installation Notes A rebate of 40mm is recommended from the front face of the surround to the front of the fire to reduce the ingress of water into...

Page 3: ...10 910 Firebox Depth C 600 600 600 600 Flange Width D 1550 1850 2050 1300 Flange Height E 935 935 935 935 Adaptor Height F 480 480 538 480 Pizza Oven Width AA 470 470 470 470 Pizza Oven Height BB 129...

Page 4: ...ith the bolting point provided on the Left and Right hand sides of the fire box seismic restraints 4 Fit the Adaptor to the Fire box Ensure that exhaust sealant is used between the fire and Adaptor Bo...

Page 5: ...rtant Notes All Framing Dimensions are Internal Only All Timber Framing Cladding must be constructed to suit an Outdoor Environment as per NZ Building Code Firebox is recessed 40mm into ACC Surround T...

Page 6: ...arth Projection SS 850 850 850 850 Plinth Width TT 1610 2010 2410 1410 Plinth Depth UU 700 700 700 700 Centre of Flue NN 450 450 450 450 TIMBER PLAN FRONT ELEVATION CROSS SECTION Important Note All Lo...

Page 7: ...tion SS 850 850 850 850 Window Height VV 940 940 940 940 Window Width WW 1560 1860 2060 1310 Note Ensure that the Fire and Flue System is Installed before the Alcove access is blocked off Block module...

Page 8: ...C Heat cell is constructed around the firebox using 75mm ACC see attached minimum spec below 2400x600x75 Power Panels are required for basic heat cell construction as shown in detail Firebox with Hebe...

Page 9: ...t cell construction as shown in detail Firebox with ACC Surround Note If plastering the Heat Cell structure it is recommended to use a fibreglass mesh with a latex plaster to minimise the chance of th...

Page 10: ...hat the flue pipe is 5mm lower that the Flashing cone 2 Fit the Top Spider into position ensure that the legs of the spider are fitted inside the liner and that the spider is positioned hard down onto...

Page 11: ...men flashing Butynol Dectite an Additional Flue pipe Baffle is required All external air vents ceiling penetrations must be bird proofed with permanently fixed screens All flashing to comply with E2 T...

Page 12: ...Y CHASE FLASHING DETAILS VENTING THROUGH CHIMNEY CHASE VENTING THROUGH FLASHING No Insulation under flashing Insulation under flashing CHIMNEY CHASE FLASHING AND AIR VENTILATION OPTIONS Note Flashing...

Page 13: ...are in mm Copyright on all products and Specifications 13 FLUE HEIGHT MINIMUM DETAILS FRAME OUT AND TRIM OUT DETAILS FOR CHIMNEY CHASE Option X Singled Lined Flue System Option Y Double Lined The flue...

Page 14: ...imension are in mm Copyright on all products and Specifications 14 Important Note All Load Bearing Structures are to be Engineered to carry load RAISED HEARTH CLEARANCES Mantle Clearances Firebox Y Z...

Page 15: ...AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHEN IT IS OPERATING WARNING DO NOT STORE FUEL WITHIN HEATER INSTALLATION CLEARANCES WARNING WHEN OPERATION THIS APPLIANCE AS AN OPEN FIRE USE A SPARK SCREEN...

Reviews: