![Warmington Nouveau BBQ 900 Installation Instructions Manual Download Page 1](http://html1.mh-extra.com/html/warmington/nouveau-bbq-900/nouveau-bbq-900_installation-instructions-manual_3417498001.webp)
9 June 2017
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notifi-
All Dimension are in mm……. Copyright on all products and Specifications ©
1
Outdoor BBQ Cooking Fire
—
Wood Burner
Installation Instructions
Nouveau BBQ 900
-
1100
-
1250
-
1500 Single Flue
Visit
www.warmington.co.nz
for Spec’s, DWG’s and PDF uploads of Fires
Fire, Flue System and Instructions to Comply with ASNZS 2918:2001
Keep these Instructions for further reference……Ensure that you have the correct and current Installation details for the Warmington Fire
Installation
The Warmington unit is to be Installed by a Certified Warmington Installer or an Approved NZHHA Installation Technician .
See www.homeheat.co.nz/members for a Certified NZHHA SFAIT Installer in your area .
IMPORTANT
Read all the Instructions carefully before commencing the Installation. Failure to follow these Instructions may result in a Fire Hazard and void the warranty .
Note: FLUE SYSTEMS Casing….
Flue system may require to be Doubled lined to comply.
Ref ASNZS:2918:2001 4.3 Flue pipe casing
Warmington
Minimum 2.4m Fluekit
Hebel Heat Cell
(Not Load Bearing)
Warmington
Outdoor Firebox
Hearth
Important Note :
All Load Bearing Structures are
to be Engineered to carry load .