1.3  Combi General Requirements

 

The boiler will have a DHW priority when both domestic hot water (DHW) and central 

heating (CH) are selected. So if the flow switch is closed or the heat store has not 

been satisfied the entire output of the boiler is directed to DHW before the boiler will 

switch over to CH. When fully cold it can take up to 20 minutes for the heat store to 

be satisfied.

 

After a draw-off of 20L at 24L/min, with an average temperature rise of 32°C, the 

thermal store has a recovery time of approximately 7 mins.

 

Note

: If HW has not been selected no hot water can be produced even if the heat 

store is up to temperature.

1.3.1  Pump Over-Run

 

Where there is a build up of excess heat in the boiler primary heat exchanger and 

the  central  heating  has  not  been  selected  then  the  pump  over-run  thermostat 

will  operate.  The  excess  heat  will  then  be  pumped  into  the  heat  store.  Once  the 

temperature  has  fallen  in  the  boiler  and  the  pump  over-run  stat  is  satisfied  or  the 

central heating pump starts to operate, then the hot water pump will stop.

1.4  Baffle Positioning

 

Before firing make sure the baffles have not been dislodged in transit. To achieve 

maximum  efficiency  push  the  primary  heat  exchanger  baffles  in  the  direction  of 

the  arrows  as  shown.  The  secondary  heat  exchanger  spring  baffles  must  be  fully 

inserted into the heat exchanger tubes (narrow end first).

Summary of Contents for U Series

Page 1: ...ency Condensing Boilers Models covered by this manual U Series Utility U70HE U90HE U120HE Utility Pumped UP70HE UP90HE Utility System US70HE US90HE Utility Combi UC70HE UC90HE K Series Kabin Pak K70HE...

Page 2: ...ance Telephone 0870 240 6532 Fax 028 9262 2827 Email service warmflow co uk Web www warmflow co uk For Parts Service Technical Warranty Contact Great Britain N Ireland Tel 0870 240 6532 Republic of Ir...

Page 3: ...Gravity System 39 4 2 Two Pipe System 40 4 3 De aerator System 40 4 4 One Pipe Lift System 41 5 0 Flues 5 1 Installation of Balanced Flues 42 5 2 Conventional Flues 44 5 3 Flue Terminal Positions 44 6...

Page 4: ...hile the boiler is still hot as this will cause damage to the thermostat Burner Lockout When the pressure jet oil fired burner stops after failing to fire the red reset button will be illuminated This...

Page 5: ...which has a cut off point of 110 C this is factory set and is not adjustable The high limit thermostat is located under the control panel to the left hand side press button to reset As standard the p...

Page 6: ...dinary plastic pipe eg plastic overflow pipe directly into the household drain or soak away Any blockage in the drain could lead to an alteration in the combustion settings because of partially blocke...

Page 7: ...ust be fitted with a suitable chemical scale preventer eg Fernox Quantomat or Combimate alternatively contact Warmflow for further details 5 That the flow from any one hot water outlet does not exceed...

Page 8: ...cturer s guarantees are void if the appliance is not installed and commissioned in accordance with the recommendations made herein 1 2 General Requirements The installation of the boiler must be in ac...

Page 9: ...duced even if the heat store is up to temperature 1 3 1 Pump Over Run Where there is a build up of excess heat in the boiler primary heat exchanger and the central heating has not been selected then t...

Page 10: ...emovable 1 5 2 U Series Utility Pre Wired UHE Key Components 1 Heat Exchanger 2 Condensing Unit 3 Auto Air Vent 4 Service Door 5 Dual Safe Thermostat 6 Heat Exchanger Baffles 7 Service Door 8 Service...

Page 11: ...t 10 Heat Exchanger Baffles 11 Service Door 12 Service Door Cover 13 Condensate Trap 14 Riello RDB 2 2 Burner 15 Heating Flow Connection 16 Heating Return Connection 1 5 4 U Series Utility System USHE...

Page 12: ...or 10 Service Door Cover 11 Control Panel 12 Expansion Vessel 13 Riello RDB 2 2 Burner 14 Heat Exchanger Baffles see dimension drawing for details of connections 1 5 6 U Series Utility Combi UCHE Cont...

Page 13: ...s Kabin Pak Casing Components 1 Boiler Assembly 2 Top Casing removable 3 Flue Assembly removable 4 Rear Flue Casing 5 Blanking Plug removable 6 Rear Casing removable 7 Side Casing 8 Front Casing remov...

Page 14: ...n 12 Heating Return Connection 1 5 9 K Series Kabin Pak Pumped KPHE Key Components 1 Heat Exchanger 2 Condensing Unit 3 Pipework Assembly 4 Pressure Relief Valve 5 Auto Air Vent 6 Circulating Pump 7 A...

Page 15: ...1 5 11 K Series Kabin Pak Combi KCHE Key Components 1 Heat Exchanger 2 Heat Store 3 Condensing Unit 4 Service Door 5 Pipework Assembly 6 Plate Heat Exchanger 7 Twin Head Pump 8 Condensate Trap 9 Servi...

Page 16: ...2 K Series Kabin Pak Combi KCHE Control Panel Control Thermostat Mains On Lamp Green High Limit Tripped Lamp Yellow Burner Lockout Lamp Red HW On Off Switch CW On Off Switch High Limit Thermostat Rese...

Page 17: ...ted CH Pump Only Runs Room Stat Satisfied Boiler Stat Satisfied Boiler Limit Stat Tripped Burner Fires DHW Pump Only Runs HW Limit Stat Satisfied Boiler Limit Stat Tripped Burner Fires Burner Stops Pr...

Page 18: ...583 50 75 86 134 21 Q P N M L K J H G F E D C B A MODEL R S UC 596 865 601 766 134 207 390 841 817 840 845 74 115 167 205 310 666 2 2 Dimensions 2 2 1 U Series Utility UHE UPHE USHE Models 2 2 2 U Ser...

Page 19: ...00 700 773 210 95 161 67 40 90 40 67 705 50 50 KP 413 900 700 773 210 95 161 67 40 90 40 67 705 50 50 KS 413 900 700 773 210 95 161 67 40 90 40 67 705 50 50 Q P N M L K J H G F E D C B A MODEL R S KC...

Page 20: ...Page 18 2 3 Flue Options Components Dimensions 2 3 1 HE Low Level Balanced Flue Kit FBF Comprising the following four main components...

Reviews: