INSTALLATION, COMMISSIONING & SERVICING RECORD
TR05A140.B1107
COMMISSIONING PROCEDURE INFORMATION
For All Boilers
Has the system been flushed in accordance with the boiler manufacturer’s instructions?
Yes
No
What cleanser was used?
Has an inhibitor been added?
Yes
No
Which inhibitor was used?
For central heating mode, measure and record:
Heat Input
kW
Burner Operating Pressure
mbar
Central Heating Flow Temperature
ºC
Central Heating Return Temperature
ºC
For Combination Boilers Only
Has a water scale reducer been fitted?
Yes
No
What type of scale reducer has been fitted?
For domestic hot water mode, measure and record:
Heat Input
kW
Maximum Burner Operating Pressure
mbar
Maximum Operating Water Pressure
bar
Cold Water Inlet Temperature
ºC
Hot Water Outlet Temperature
ºC
Water Flow Rate at Maximum Setting
l/min
For Condensing Boilers Only
Has the condensate drain been fitted in accordance with the manufacturer’s instructions?
Yes
No
For All Installations
Does the heating and hot water system comply with the appropriate Building Regulations?
Yes
Has the appliance and associated equipment been installed and commissioned in accordance with
the manufacturer’s instructions?
Yes
Have you demonstrated the operation of the appliance and system controls to the customer?
Yes
Have you left all the manufacturer’s literature with the customer?
Yes
Competent Person’s Signature
Customer’s Signature
(To confirm demonstrations of equipment and receipt of
appliance instructions)
Summary of Contents for GS25A
Page 2: ...TR05A140 B1107...
Page 59: ...THIS PAGE IS INTENTIONALLY BLANK THIS PAGE IS INTENTIONALLY BLANK...
Page 60: ...THIS PAGE IS INTENTIONALLY BLANK THIS PAGE IS INTENTIONALLY BLANK...
Page 64: ...THIS PAGE IS INTENTIONALLY BLANK THIS PAGE IS INTENTIONALLY BLANK...
Page 65: ...THIS PAGE IS INTENTIONALLY BLANK THIS PAGE IS INTENTIONALLY BLANK...