Page
57
4.
Lubricate and fit the extension (C) and bend (D) then secure with the locking
bands.
5.
Fit the air inlet spigot and gasket to the burner. Attach the flexible air hose to
the burner and starter assembly and secure with the jubilee clips.
MEASURE AND CUT FLUE TERMINAL
i.
Cut a hole through the wall and fit a non-combustible sleeve.
ii.
Fit the flue terminal (E) and measure the excess length,
X
.
iii.
Cut
X
mm from the outer pipe of the terminal then
X
mm from the inner pipe.
Note:
A terminal guard is required if the termination location is less than 2m
above external ground level.
Summary of Contents for BoilerhouseB70HE
Page 13: ...4 5 2 U Series Utility Casing Components Models up to 120 HE 150 HE Models Page 11...
Page 14: ...4 5 3 U Series Utility Pre Wired UHE Key Components Models up to 120 HE 150 HE Models Page 12...
Page 15: ...4 5 4 U Series Utility Pumped UPHE Key Components Models up to 120 HE 150 HE Models Page 13...
Page 17: ...4 5 7 K Series Kabin Pak Casing Components Models up to 120 HE 150 HE Models Page 15...
Page 19: ...4 5 9 K Series Kabin Pak Pumped KPHE Key Components Models up to 120 HE 150 HE Models Page 17...
Page 22: ...Page 20 4 5 13 Combi Pipe Layout UCHE KCHE Models...
Page 23: ...Page 21 5 TECHNICAL DETAILS 5 1 Combi Sequence of Operation Flow Chart...
Page 25: ...Page 23 5 2 3 U Series Utility 150HE Models 5 2 4 U Series Utility UCHE Models...
Page 27: ...Page 25 5 2 7 K Series Kabin Pak 150HE Models 5 2 8 K Series Kabin Pak Base Tray 150HE Models...
Page 28: ...Page 26 5 2 9 K Series Kabin Pak KCHE Models 5 2 10 K Series Kabin Pak Base Tray KCHE Models...
Page 41: ...Page 39 6 3 2 Wiring Schematic...
Page 66: ...Page 64 8 1 10 Kabin Pak Plume Management Kit KPMK The kit comprises...
Page 78: ...Page 76 13 BURNER FAULT FINDING 13 1 Riello RDB...
Page 79: ...Page 77 14 COMBI FAULT FINDING 14 1 Central Heating...
Page 80: ...Page 78 14 2 Domestic Hot Water...
Page 91: ......