Page
37
6 ELECTRICITY SUPPLY & WIRING DETAILS
220 – 240V. 1PH, 50Hz
The boiler/burner and other external electrical equipment should be wired with
heat resistant cable via a fused double pole isolating switch which should be fitted
with a 5 amp fuse.
The appliance must be effectively earthed and all external wiring should comply
with current IEE Regulations.
6.1 Dual-Safe Thermostat (Non-Combi Boilers)
Warning:
Do not fit any other wires or loop wires to this stat as this will bypass the
thermostats.
6.2 RDB Burner Control Box
Summary of Contents for BoilerhouseB70HE
Page 13: ...4 5 2 U Series Utility Casing Components Models up to 120 HE 150 HE Models Page 11...
Page 14: ...4 5 3 U Series Utility Pre Wired UHE Key Components Models up to 120 HE 150 HE Models Page 12...
Page 15: ...4 5 4 U Series Utility Pumped UPHE Key Components Models up to 120 HE 150 HE Models Page 13...
Page 17: ...4 5 7 K Series Kabin Pak Casing Components Models up to 120 HE 150 HE Models Page 15...
Page 19: ...4 5 9 K Series Kabin Pak Pumped KPHE Key Components Models up to 120 HE 150 HE Models Page 17...
Page 22: ...Page 20 4 5 13 Combi Pipe Layout UCHE KCHE Models...
Page 23: ...Page 21 5 TECHNICAL DETAILS 5 1 Combi Sequence of Operation Flow Chart...
Page 25: ...Page 23 5 2 3 U Series Utility 150HE Models 5 2 4 U Series Utility UCHE Models...
Page 27: ...Page 25 5 2 7 K Series Kabin Pak 150HE Models 5 2 8 K Series Kabin Pak Base Tray 150HE Models...
Page 28: ...Page 26 5 2 9 K Series Kabin Pak KCHE Models 5 2 10 K Series Kabin Pak Base Tray KCHE Models...
Page 41: ...Page 39 6 3 2 Wiring Schematic...
Page 66: ...Page 64 8 1 10 Kabin Pak Plume Management Kit KPMK The kit comprises...
Page 78: ...Page 76 13 BURNER FAULT FINDING 13 1 Riello RDB...
Page 79: ...Page 77 14 COMBI FAULT FINDING 14 1 Central Heating...
Page 80: ...Page 78 14 2 Domestic Hot Water...
Page 91: ......