Str. 4
INS_14092022
CONDITIONS FOR SAFE AND RELIABLE OPERATION
1.
Compliance with this installation and operation manual will enable proper
installation and operation of the device, ensuring a long service life and reliable
operation.
2.
It is not allowed to install the tank not in accordance with the instructions, it
threatens with failure, malfunction of the system and causes the loss of warranty.
3.
When working with the device, health and safety rules and other regulations in force
in a given country should be observed.
4.
The device must not be installed in rooms where the ambient temperature may fall
below 0°C.
5.
Installation and commissioning should be carried out by a specialist service facility.
6.
The tank should only be mounted vertically.
7.
After setting, the device must be connected to the water supply network and central
heating system according to the scheme contained in this manual.
8.
The connection to the plumbing system should be made in accordance with PN-76/B-
02440.
9.
The tank is a pressure device adapted to be connected to the plumbing, the
maximum
pressure of the tank is 0.6 MPa and the
rated
pressure of
the coil is
0.6 MPa.
In case of
higher pressure in the plumbing, a pressure reducer should be installed.
10.
Dripping water from the drainage pipe from the safety valve is normal and should
not be prevented, as a blockage of the valve can cause failure.
11.
Do not use the tankif there is a chance that the safety valve is damaged.
12.
The maximum temperature of 95
°C
must not be exceeded in the
operation of the
collectiontank.
13.
An additional diaphragm vessel selected according
to the
previously made
calculations
should be installed to the tank.
14.
An electric heater can be mounted to the tank.
Summary of Contents for ZC-02
Page 2: ...Str 2 INS_14092022...
Page 6: ...Str 6 INS_14092022 Tank construction 200 ZC 02...
Page 7: ...Str 7 INS_14092022 Tank dimensions 200 ZC 02...
Page 8: ...Str 8 INS_14092022 Construction TankA 250 ZC 025...
Page 9: ...Str 9 INS_14092022 Tank dimensions 250 ZC 025...
Page 10: ...Str 10 INS_14092022 Construction of tank 250 with two coils ZCC 0 25...
Page 11: ...Str 11 INS_14092022 Tank dimensions 250 with two coils ZCC 025...
Page 12: ...Str 12 INS_14092022 Tank construction 500 ZC 05...
Page 13: ...Str 13 INS_14092022 Tank dimensions 500 ZC 05...
Page 14: ...Str 14 INS_14092022 Tank dimensions 500 with two coils ZCC 05...
Page 15: ...Str 15 INS_14092022 Construction of Tank 500 with two coils ZCC 05...
Page 16: ...Str 16 INS_14092022 Dimensions and construction of the tank 1000 ZC 10...
Page 22: ...Str 22 INS_14092022...