background image

 

 
 

Str. 13

 

 

INS_14092022 

Tank dimensions 500 ZC-05 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for ZC-02

Page 1: ...INSTALLATION AND OPERATING INSTRUCTIONS Tank 2in1 Models ZC 02 ZC 0 25 ZCC 025 ZC 05 ZCC 05 ZC 10...

Page 2: ...Str 2 INS_14092022...

Page 3: ...mensions 250 with two coils ZCC 025 11 Tank construction 500 ZC 05 12 Tank dimensions 500 ZC 05 13 Tank dimensions 500 with two coils ZCC 05 14 Construction of Tank 500 with two coils ZCC 05 15 Dimens...

Page 4: ...ting the device must be connected to the water supply network and central heating system according to the scheme contained in this manual 8 The connection to the plumbing system should be made in acco...

Page 5: ...e use of a flow coil stainless steel AISI 316L in the tank there is no need to use an anode and it is not necessary to periodically heat the tank because there is a constant supply of fresh water The...

Page 6: ...Str 6 INS_14092022 Tank construction 200 ZC 02...

Page 7: ...Str 7 INS_14092022 Tank dimensions 200 ZC 02...

Page 8: ...Str 8 INS_14092022 Construction TankA 250 ZC 025...

Page 9: ...Str 9 INS_14092022 Tank dimensions 250 ZC 025...

Page 10: ...Str 10 INS_14092022 Construction of tank 250 with two coils ZCC 0 25...

Page 11: ...Str 11 INS_14092022 Tank dimensions 250 with two coils ZCC 025...

Page 12: ...Str 12 INS_14092022 Tank construction 500 ZC 05...

Page 13: ...Str 13 INS_14092022 Tank dimensions 500 ZC 05...

Page 14: ...Str 14 INS_14092022 Tank dimensions 500 with two coils ZCC 05...

Page 15: ...Str 15 INS_14092022 Construction of Tank 500 with two coils ZCC 05...

Page 16: ...Str 16 INS_14092022 Dimensions and construction of the tank 1000 ZC 10...

Page 17: ...e water supply side to avoid the flow of water from the tank side to the cold water supply port install a tee with a safety group including a diaphragm vessel and a safety valve with an opening pressu...

Page 18: ...onnection should be made as in the case of connection to the plumbing system and additionally make The connection to the central heating system should be made using 5 4 connection screws and shut off...

Page 19: ...r Open the valve on the cold water supply Open the hot water intake valve in the system the outflow of a full stream of water without air bubbles indicates that the tank is full Close the tap valves T...

Page 20: ...ss Any irregularities in the operation of the device should be reported to the service facility These activities are at your own expense and are not subject to warranty TECHNICAL SPECIFICATIONS Domest...

Page 21: ...revents potential negative effects on the environment that could occur in the event of improper waste management For more detailed information on the recycling of this product please contact your loca...

Page 22: ...Str 22 INS_14092022...

Page 23: ...Str 23 INS_14092022 PRODUCER ENERGIA ON SP Z O O MIKOLAJA REJA 13 15 1101 81 874 SOPOT WARME COM PL...

Reviews: