Maintenance Schedule
In order to obtain the best performance and last its service lift, please maintain your unit according to the
following schedule and instructions.
DAILY
1.
Test brake effectiveness before you drive
2.
Recharge batteries fully every night
WEEKLY
1.
Check tyre pressure – Pressure should be 40-50 psi
2.
Check and tighten the throttle screw
MONTHLY
1.
Check battery condition. Clean battery terminals if necessary
2.
Check all electrical wire connectors to eliminate loose connections
3.
Tighten all exposed screws and nuts
4.
Check wheel bearings by spinning tyres and checking for free rotation
Throttle Adjustment
1.
Release the clutch level, thus the motor can rotate freely
2.
Note on the throttle control potentiometer, when the control lever is swinging, how the mount
plate retain one end of the spring while the control bracket pulls the other end of the spring in the
direction of rotation. As the lever rotates in the opposite direction, the other spring end is pulled in
the opposite direction.
3.
With key in and speed setting at low, rotate the throttle lever until you just hear the brake release
click and motor starts running. Notice the angle rotated between the lever and the P2GO
Turnmate.
4.
Rotate the throttle lever in the opposite direction till just brake release clicks, notice the angle
rotated between the lever and P2GO Turnmate in this direction.
5.
If the angles are not identical, loosen control bracket screws, rotate potentiometer shaft and few
degrees by using a flat screwdriver and re-tighten it.
6.
Repeat until the reverse, neutral and forward are in proper ranges.
7.
Make sure throttle control lever is parallel to tiller handle. If the lever is not parallel, full range
rotation in one direction will not be possible, resulting in loss of speed in that direction.