Installation
[M2001452_0] - EN / 22.06.12
Page 13 of 20
Subject to change without notice
)
NOTE
Check that the substructure is even by holding a
suitable tool (e.g. a spirit level) against it and cor-
rect any unevenness.
Attach the brackets to
the substructure using
suitable fixing materials.
Mounting the top rail brackets
Mark the position of the
top rail brackets on the
substructure (see
Fig. 4/p. 12).
Hold the top rail bra-
ckets properly aligned
at the markings in the
vertical and horizontal
directions.
Transfer the fixing
template of the top rail
brackets to the
mounting substructure.
)
NOTE
Pencil in the fixing
positions centrally to
permit corrections
later on.
Drill the fixing holes
depending on the sub-
structure.
)
NOTE
Check that the substructure is even by holding a
suitable tool (e.g. a spirit level) against it and cor-
rect any unevenness.
Open the top rail bra-
ckets.
Attach the top rail bra-
cket to the substruc-
ture/bracket using
suitable fixing materials.
3.6
Preparing the feedthrough for the power
line
WARNING
Short circuit due to damage to the power line
from unclean feedthrough.
Avoid or remove sharp edges around the
feedthrough.
Execute the on-site feedthrough according
to the applicable standards and regulati-
ons (e.g. use of plug-in grommets).
)
NOTE
The VDE (German Association for Electrical,
Electronic & Information Technologies) regulations
and the legal requirements and standards of each
country for sealing line feedthroughs must be
followed.
CAUTION
Product damage!
When drilling, take any electrical cables,
water pipes, and so on into consideration.