Position of brackets/top rail brackets
)
NOTE
Note the following points when positioning the
brackets/top rail brackets:
Routing of the tension cables
Swivelling range of top rail brackets
Position of the bearings and motors
Top rail bracket plan (if available)
Dimensional drawing (if available)
d
d
2
0
0
0
0
6
0
0
6
1 Auxiliary motor
L
Slat size
2 Top rail bra-
cket/bracket
X
End distance =
250 mm
3 Tilting tape/lifting tape
4 External venetian blind
drive (motor)
Fig. 4:
Dimensional drawing for top rail bracket/bracket
(all dimension in mm)
Slat size L
Number of top rail bra-
ckets/brackets
To 1300 mm
2 pieces
To 2500 mm
3 pieces
To 3500 mm
4 pieces
Tab. 7:
Number of top rail brackets/brackets depending on
slat size
)
NOTE
For cover panels that will later be plastered on the
front side, we recommend additional brackets for
stiffening.
Installing the brackets
)
NOTE
Only necessary for the attachment of a top rail
bracket using a bracket.
Mark the position of the
bracket on the substruc-
ture (see Fig. 4/p. 12)
Hold the brackets pro-
perly aligned at the
markings in the vertical
and horizontal direc-
tions.
Transfer the fixing
template of the brackets
to the mounting sub-
structure.
)
NOTE
Pencil in the fixing
positions centrally to
permit corrections
later on.
Drill the fixing holes
depending on the sub-
structure.