Item no. 43.99990.BA-EN07 / 27.09.19
29/36
Installing a wall attachment
6
Installing a wall attachment
6.1
Wall attachment
Fig. 95
►
Select the wall attachment that best matches the wall distance.
►
Hold the wall attachment against the wall and the shelf upright and mark the dowel hole.
►
Drill the hole for the dowel.
►
Screw the wall bracket to the wall using the hole (C).
►
Align the shelf upright vertically.
►
Screw the wall bracket to the shelf upright using two 4.2x16 (D) drilling screws.
– Always attach the wall bracket to the shelf upright with two drilling screws!
CAUTION!
Risk of injury due to insufficiently secured shelving systems.
The result: Risk of injury due to tipping shelving systems.
►
Make sure that both the brickwork and the wall anchorage (dowels) are sufficiently
dimensioned to support the loads.
►
If the brickwork is not suitable for dowel fastening, secure the shelf anchorage with
suitable on-site measures such as angle rails, wall anchors, etc. On a standard shelf
carrying a load of 375 kg / 827 lb and an installation height of the wall attachment of
2,240 mm / 88 in, the extraction force on the dowel is 60 kg / 133 lb.
►
When fastening the dowels, make sure that a sufficient number of dowels is used so
that the recommended load values of the dowel manufacturer are not exceeded. Install
additional wall attachments if necessary.
►
Use screws and dowels suitable for the respective substrate.
General mounting height at 2,240 mm / 88 in and after each additional meter.
The wall attachment does not increase the shelf load.