13
3. Installation
👥
Installers
The following section is intended for the installers of the MQTT.box and assumes
appropriate expertise.
Mounting in the control cabinet
⛳
Mount on top hat rail
❗
Note: Risk of property damage imminent
Please observe the safety instructions in chapter 1.
The MQTT.box can be mounted on DIN rail (TH 35).
1.
Place the MQTT.box slightly angled upwards with the receptacle on the up
-
per edge of the top-hat rail.
2.
Press the device against the top-hat rail from the top front until the holder
clicks into place.
The MQTT.box is now firmly mounted on top-hat rail.
Set up power supply
⛳
Set up power supply via PoE
The MQTT.box can be electrically supplied via network socket 1 as a device of
power class 2 via PoE according to IEEE802.3af. For this you need
•
A PoE switch or a PoE injector
1.
Connect the network socket 1 of the MQTT.box to the PoE switch / the PoE
injector via a shielded network cable.
The MQTT.box starts operation.