Maintenance
LINA | Instructions for Use | RIK-1 Med ENG Rev03 | 11/05/2020 | © 2020 W&H Sterilization Srl
55
CONTENTS
This section deals with the following subjects:
Warnings for maintenance operations
Monthly or 50-cycle maintenance
800-cycle or biannual maintenance
4000 cycle or five-year maintenance
Warnings for maintenance operations
WARNINGS
WARNING! Turn the sterilizer OFF and remove the power
cord before beginning any maintenance. Follow all health,
safety, cross-infection and cross-contamination protocols.
Maintenance operation shall be done at illumination level of
215 lx (±15 lx) to 1500 lx (±15 lx).
Before making any operation, ward off unauthorized
personnel from the working area.
CAUTION! Before accessing the chamber and the connected
parts, be sure that the sterilizer is cold.
Notice: Follow the instructions in this chapter when carrying out any
maintenance on the sterilizer.
Ordinary maintenance
MAINTENANCE BY THE USER
Frequency
1
Cycles
1
Operation
Monthly
50
Cleaning the door gasket and the chamber face
side. See "Cleaning the door gasket and the
chamber face side" on page 57
Clean the chamber, steam diffuser plate, trays
and the rack. See "Cleaning the chamber and the
chamber accessories" on page 58
Cleaning the chamber filter. See "Cleaning the
chamber filter" on page 59
Cleaning the external surfaces of the sterilizer.
See "Cleaning the external surfaces of the
sterilizer" on page 61
6 month
800
Clean both water tanks. See "800-cycle or
biannual maintenance" on page 64.
Summary of Contents for lina
Page 1: ...RIK 117 RIK 122 Instructions for Use RIK 1 Med ENG Rev03 ...
Page 2: ......
Page 113: ......