23
GB
t $IFDLJGUIFDPOOFDUJPOJTHBTUJHIU
t #F TVSF OPU UP EBNBHF UIF QJMPU QJQF PG UIF CVSOFS
QJQFXIFOQMBDJOHUIFTFSWJDFnBQ
Placing of the concentric channel sys-
tem
The concentric channel system consists of three parts:
the channels itself, the transit through the roof or through
BXBMMBOEUIFPVUnPX
Instructions for placing the outflow
5IFPVUnPXPGUIFQJQFTZTUFNDBOCFQMBDFEPOUPQPG
the roof or against the side wall of the house.
Roof outlet
8IFOQMBDJOHUIFPVUnPXPOUPQPGUIFSPPGNBLFTVSF
that there is a distance of at least 50 cm between the
PVUnPXBOEUIFFEHFTPGUIFSPPGXJUIUIFFYDFQUJPOPG
a possible existing ridge. You must also take the place of
UIFPVUnPXJOUPBDDPVOUJOSFMBUJPOUPUIFFYJTUJOHWFO
-
tilation openings, movable windows and combustion air
supply provisions. Please consult the national and local
requirements.
Wall outlet
8IFOQMBDJOHUIFPVUnPXJOUPUIFTJEFXBMMNBLFTVSF
that there is distance of at least 50 cm between the out-
nPXBOEUIFDPSOFSTPGUIFCVJMEJOHFBWFTHVUUFSTCBM
-
conies and etceteras. You need not have this distance
XIFOUIFPVUnPXSVOTUISPVHIUPBUMFBTUUIFGSPOUPGUIF
overhanging part.
:PVNVTUBMTPUBLFUIFQMBDFPGUIFPVUnPXJOUPBDDPVOU
in relation to the existing ventilation openings, movable
windows and combustion air supply provisions. Please
consult the national and local requirements.
Placing possibilities of the pipe system
The total length of the pipe system must never be more
than 10 metres excluding the passage through the wall
BOEUIFPVUnPX"¡TRVBSFBOHMFDPVOUTBTBMFOHUIPG
2 metres. A 45° turn counts as a length of 1 metre.
For the combined flue tube and combustion air supply
you must apply one of the following placing possibili-
ties of the WANDERS concentric pipe systems: with wall
duct, with roof duct or with roof duct with bend.
Pay special attention to proper installing when, due to
circumstances, a part of the double-walled pipe system
must be built in.
Wall outlet
t "MXBZT BMMPX POF NFUSF WFSUJDBM CFGPSF QBTTJOH
through the outer wall.
t %FUFSNJOFUIFMPDBUJPOPGUIFHBTVOJUBOEUIFFYUF
-
rior wall duct.
t .BLFBOPQFOJOHPG
Ø
155 mm for the wall duct.
t $POOFDUUIFXBMMEVDUXJUIBDVSWFUPUIFNPVUIPG
the appliance. Push them firmly together and place
the clip bindings. The blue rubber ring ensures suf-
ficient sealing of the discharge system of the waste
gas.
t *GUIFBQQMJBODFJTQMBDFENPSFUIBONFUSFGSPNUIF
wall, place the vertical one-metre pipe first on the ap-
pliance, then place the curved part, then the exterior
wall duct, and then make them gastight.