9032X
5
Checklist of Materials
In order to ensure customer satisfaction, Waltron does its best to provide adequate and
timely packaging and shipping services. Please perform the following after receiving a
shipment:
Inspect all shipping containers upon receipt and record any visible damage. If
there are any outward signs of damage, please retain all containers and
packages for inspection by carrier. Please retain all packing material so that it
can be used for future moving and shipping needs.
Check all items received against those on the packing list. Chemicals are
usually shipped in a separate package and will be itemized accordingly.
Verify that the number of packages received agrees with the packing list and
shipping papers.
Notify both Waltron and the carrier if any problems occur.
Important Notice
All monitors are inspected and tested prior to shipment.
In normal use, the unit should require only minor maintenance and should
operate correctly and without fault over a long period of time.
Please note that if electronic components need to be replaced, it may be
necessary to adjust and/or calibrate the monitor.
Failure to carry out correct maintenance procedures may result in inaccurate
monitor reading.