background image

Pre Assembly

Position press lock on the door 

align with key hole and fix into 

position using 4 x 10mm screws.

Then fit barrel bolts to top and 

bottom of the door as shown in 

diagram. Use 4x10mm screws 

per barrel bolt.

Ensure doors open and close 

freely.

12x10mm Screws

10mm 

screw

Pre drill 

hole

Drill a hole in the framing 

above and below the door 

for the tower bolt to fix 

into.

Pre drill holes then fix Chrome 

Handle using 35mm coach screw 

as shown in diagram.

Pre drill 

hole

35mm

bolt

25

23

27

4x35mm Bolt

Step 1

First assemble the two floor 

panels as shown using 

6x50mm screws. 

Place floors on a firm and level 

base, ensure base has suitable 

drainage  free from areas 

where standing water can 

collect.  (See front page on 

base requirements).

6x50mm Screws

  

6

5

a

a

a

a

a

a

2

1

2

Step 2

Fix the window panels and the 

door panel at each corner 

using 6x60mm screws as 

shown in the diagram.

6x60mm Screws

  

Pre drill 

hole

50mm 

screw

Pre drill 

hole

60mm 

screw

P 3

Please retain product label and instructions for future reference

             

Wood is a natural product and is  subject to movement 

with changing weather conditions. It is important that 

you fit the turn buttons and tower bolts as per the fitting 

instructions.

Summary of Contents for 03TGCOR0808-V4

Page 1: ...xtended periods of warm sunshine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treated as soon as possible and annually to preve...

Page 2: ...y to erect your building MADE IN GREAT BRITAIN Door Panel QTY 1 AI 03TGCOR0808 V4DP Window Panel QTY 2 AI 03TGCOR0808 V4WP Rear Panel Right QTY 1 AI 03TGCOR0808 V4RPR Rear Panel Left QTY 1 AI 03TGCOR0...

Page 3: ...mm Bolt Step 1 First assemble the two floor panels as shown using 6x50mm screws Place floors on a firm and level base ensure base has suitable drainage free from areas where standing water can collect...

Page 4: ...he top of the panels as shown in the diagram 6x50mm Screws Pre drill hole 50mm screw 28 12 11 Step 6 First position the roof support bar in the centre of the building between the back corner and the a...

Page 5: ...ture reference Step 9 Place both roof sections on top of building ensure roof framing slots over each side equally all the way around Fix roof sheets into position using 40mm screws ensuring that they...

Page 6: ...ing felt tacks along where sheet overlap 100x Felt Tacks Felt tacks Step 11 Fix the cover trims to the front and side of the building using 3x40mm screws per strip 12x40mm Screws Pre drill hole 40mm s...

Page 7: ...er guard 6x60mm Screws 60mm screw Pre drill hole Step 16 Fix the rear cover trimsto the back of the building aligning with the edge of the panel 6x40mm Screws 40mm screw Pre drill hole 30 30 32 Step 1...

Page 8: ...2 1 3 4...

Page 9: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Reviews: