2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Summary of Contents for 01TDM1008DDFW-V2

Page 1: ...th a water based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the...

Page 2: ...ves Frame 1001mm Qty 6 Truss Block 140mm Qty 6 Fascia 1333mm Qty 4 Cover Trim 1575mm Qty 6 Window Strip 546mm Qty 10 Finial Qty 2 14 15 Truss Support 490mm Qty 3 Plastic Window Cill 21 20 Turn Button...

Page 3: ...ion the panels so there is equal spacing between the floor and cladding on all 4 sides Step 2 2 3 3x50mm Screws 50mm screw Pre drill hole Step 3 Fix the remaining plain side and a window side at the c...

Page 4: ...50mm screw through the ridge bar into the truss frame ii Align the second truss frame with the first on the opposite side of the ridge bar and fix with a 50mm screw at an angle as illustrated ENSURE...

Page 5: ...building the same way as shown in step 6 through to 8 8x50mm Screws 9 11 10 4x40mm Screws Step 11 Attach another two roof sheets ontop of the two truss s in the same way as stated in step 9a ensuring...

Page 6: ...ws on each eave 20x40mm Screws 6x30mm Screws Fix the final eaves frame to the roof sheet using 3x30mm screws for each sheet 12x30mm Screws 40mm screw Pre drill hole 30mm screw Pre drill hole 30mm scre...

Page 7: ...HANDLE WITH CARE 1 2 3 4 Step 14 Fit the cover trims to the building and secure in place with 30mm screws as shown Pre drill to avoid splitting 18x30mm Screws 13 13 13 13 13 13 30mm screw Pre drill h...

Page 8: ...the outside into the door to fix into postion To allow for the Lock to be fixed later secure the Door Blocks to the top of the centre framing 3x30mm Screws 4x40mm Screws Slave Master 26 25 To fix the...

Page 9: ...ter the framing in the window panel and not the styrene 9x30mm Screws 30mm screw Pre drill hole 6x30mm Screws 30mm screw Pre drill hole 15 15 15 15 15 15 15 15 Fix the Turn Button onto the door gable...

Reviews: