background image

P 2

01TDM1008DDFW-V2

Please retain product label and instructions for future reference

             

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

Overall Dimensions:

 

Length = 3028mm

Width = 2484mm

Height = 2121mm

Base Dimensions: 

Length = 3016mm

Width = 2414mm

Building content

Door Gable

Back Gable

Plain Side Qty 2 Window Panel Qty 2

Floor

Qty 2

Roof

Qty 8

1

2

3

4

5

6

T Hinge Qty 6

Felt

17

19

L-Bracket

Qty 2

18

8

9

11

12

13

16

10

Ridge Bar - 1462mm Qty 2

Truss Frame - 1302mm Qty 6

Eaves Frame - 1001mm Qty 6

Truss Block - 140mm Qty 6

Fascia -1333mm Qty 4

Cover Trim - 1575mm Qty 6

Window Strip - 546mm Qty 10 

Finial 

Qty 2

14

15

Truss Support - 490mm Qty 3

Plastic Window Cill

21

20

Turn Button

Qty 4

Styrene

Qty 4 

22

23

U Channel

24                      

Hasp and 

Staple Lock

Cloaking Strip - 1598mm 

25

26

Door Block - 160mm 

Qty 2

Nail Bag

30mm Screw x 149

30mm Black Screw x 4

50mm Screw x 65

40mm Screw x 106

Felt Tacks x 132

Remove transportation 

blocks from the bottom 

of each panel before 

beginning assembly. Each 

Panel should have two 

Pre Assembly 

Fix the T Hinges onto the 

doors and door frame as 

shown. Ensure that the 

screws go through the 

cladding and into the 

framing behind.

42x30mm screws

30mm 

screw

Pre drill 

hole

 7

 7

18

Door

x2

7

Summary of Contents for 01TDM1008DDFW-V2

Page 1: ...th a water based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the...

Page 2: ...ves Frame 1001mm Qty 6 Truss Block 140mm Qty 6 Fascia 1333mm Qty 4 Cover Trim 1575mm Qty 6 Window Strip 546mm Qty 10 Finial Qty 2 14 15 Truss Support 490mm Qty 3 Plastic Window Cill 21 20 Turn Button...

Page 3: ...ion the panels so there is equal spacing between the floor and cladding on all 4 sides Step 2 2 3 3x50mm Screws 50mm screw Pre drill hole Step 3 Fix the remaining plain side and a window side at the c...

Page 4: ...50mm screw through the ridge bar into the truss frame ii Align the second truss frame with the first on the opposite side of the ridge bar and fix with a 50mm screw at an angle as illustrated ENSURE...

Page 5: ...building the same way as shown in step 6 through to 8 8x50mm Screws 9 11 10 4x40mm Screws Step 11 Attach another two roof sheets ontop of the two truss s in the same way as stated in step 9a ensuring...

Page 6: ...ws on each eave 20x40mm Screws 6x30mm Screws Fix the final eaves frame to the roof sheet using 3x30mm screws for each sheet 12x30mm Screws 40mm screw Pre drill hole 30mm screw Pre drill hole 30mm scre...

Page 7: ...HANDLE WITH CARE 1 2 3 4 Step 14 Fit the cover trims to the building and secure in place with 30mm screws as shown Pre drill to avoid splitting 18x30mm Screws 13 13 13 13 13 13 30mm screw Pre drill h...

Page 8: ...the outside into the door to fix into postion To allow for the Lock to be fixed later secure the Door Blocks to the top of the centre framing 3x30mm Screws 4x40mm Screws Slave Master 26 25 To fix the...

Page 9: ...ter the framing in the window panel and not the styrene 9x30mm Screws 30mm screw Pre drill hole 6x30mm Screws 30mm screw Pre drill hole 15 15 15 15 15 15 15 15 Fix the Turn Button onto the door gable...

Reviews: