background image

Step 7

layout the roof panels and 

position them as shown in 

diagram. Secure the panels 

together using 6x50mm 

screws.

* It is recommended to cut the 

roof felt sheets before fixing 

the roof to the building.

6x50mm Screws

  

Pre drill 

hole

50mm 

screw

7

8

Pre drill 

hole

40mm 

screw

Step 10

Secure the building to the 

floor. Fix the panels 50mm 

screws in alignment with the 

floor joists.

20x50mm Screws

  

Pre drill 

hole

50mm 

screw

P 5

Please retain product label and instructions for future reference

             

Step 9

Place both roof sections on top 

of building, ensure roof 

framing slots over each side 

equally all the way around.

Fix  roof sheets into position 

using 40mm screws ensuring 

that they line up with the 

vertical framing inside the 

building and along the length 

of the internal roof support 

bar.

20x40mm Screws

19

18

31

Step 8

Attach the front and rear roof

framing to the roof as shown

in the illustration using 6x30mm

screws.

*Ensure to fix the framing the

opposite direction to the

roof bearers. 

Fix the locating blocks to the

opposing sides to the roof

framing (

these blocks are to

help square the roof when

fitted

).

10x40mm Screws

40mm 

screw

Pre drill 

hole

Summary of Contents for 03TGCOR0808-V4

Page 1: ...xtended periods of warm sunshine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treated as soon as possible and annually to preve...

Page 2: ...y to erect your building MADE IN GREAT BRITAIN Door Panel QTY 1 AI 03TGCOR0808 V4DP Window Panel QTY 2 AI 03TGCOR0808 V4WP Rear Panel Right QTY 1 AI 03TGCOR0808 V4RPR Rear Panel Left QTY 1 AI 03TGCOR0...

Page 3: ...mm Bolt Step 1 First assemble the two floor panels as shown using 6x50mm screws Place floors on a firm and level base ensure base has suitable drainage free from areas where standing water can collect...

Page 4: ...he top of the panels as shown in the diagram 6x50mm Screws Pre drill hole 50mm screw 28 12 11 Step 6 First position the roof support bar in the centre of the building between the back corner and the a...

Page 5: ...ture reference Step 9 Place both roof sections on top of building ensure roof framing slots over each side equally all the way around Fix roof sheets into position using 40mm screws ensuring that they...

Page 6: ...ing felt tacks along where sheet overlap 100x Felt Tacks Felt tacks Step 11 Fix the cover trims to the front and side of the building using 3x40mm screws per strip 12x40mm Screws Pre drill hole 40mm s...

Page 7: ...er guard 6x60mm Screws 60mm screw Pre drill hole Step 16 Fix the rear cover trimsto the back of the building aligning with the edge of the panel 6x40mm Screws 40mm screw Pre drill hole 30 30 32 Step 1...

Page 8: ...2 1 3 4...

Page 9: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Reviews: