Rev. 1.1
Assembly Instructions
–
Hand Dosing Device WDVHP-0x-HG
Page 12 of 19
Walther Systemtechnik GmbH
–
D 76726 Germersheim
Telefon: +49 (0)7274-7022-0 Telefax: +49 (0)7274-7022-91
http://www.walther-2000.de
–
7 Taking out of Service
7.1 Short Interruption
A short interruption (15 min or more) has to be followed by a fine spraying.
IMPORTANT
Please follow the maintenance instructions!
7.2 Long-term Interruption
The following has to be observed for a long-term interruption of the device:
No pressure shall be left in system (check displays).
IMPORTANT
Please follow the maintenance instructions
!
7.3 Shutdown of Device
The following has to be observed for a final shutdown of the device:
Disconnect the main power plug.
No pressure shall be left in the system (check displays).
Dispose properly of grease/oil.
Clean dosing valve with special thinner
WARNING
Danger of accidents and environmental pollution. Do not spill grease / oil. Dispose
properly of grease / oil (hazardous waste).
IMPORTANT
Please follow the maintenance instructions!