Initial commissioning
15
DOK BEMO 11/20 Rev.01 PM
6 Initial commissioning
This chapter is intended for installers of the wallbox.
Wallboxes may only be commissioned by a qualified electrician with proven knowledge.
WARNING
Death or risk of injury from electric shock due to contact with live components
f
Observe the five safety rules defined according to DIN VDE 0105[4].
f
Ensure that the supply voltage is switched off.
f
Ensure that power supply cable is electrically dead.
f
Carry out initial commissioning only with suitable and approved devices.
f
Carry out initial commissioning according to the protocols of the standards DIN VDE 0100-600,
DIN VDE 0105-100 and DIN VDE 0100-722 and in accordance with country-specific requirements
and guidelines.
f
Log test results.
f
Tighten all pre-assembled connection screws in the interior of the enclosure.
f
Make sure that the supply voltage is present.
f
After the supply voltage is switched on it may take up to 5 minutes before charging is possible.
The device is ready for operation when the LED indicator lights up green.