background image

 

2

DOK BEMO  11/20 Rev.01 PM

Imprint

WALTHER-WERKE

Ferdinand Walther GmbH

Ramsener Str. 6

DE-67304 Eisenberg
Tel.: + (49) 6351 / 475-0
[email protected]

www.walther-werke.de

Summary of Contents for smartEVO11

Page 1: ...INSTALLATION OPERATINGINSTRUCTIONSWALLBOX smartEVO11 smartEVO22 smartEVOPRO 22...

Page 2: ...2 DOK BEMO 11 20 Rev 01 PM Imprint WALTHER WERKE Ferdinand Walther GmbH Ramsener Str 6 DE 67304 Eisenberg Tel 49 6351 475 0 e mobility walther werke de www walther werke de...

Page 3: ...tion 11 5 1 Transport and installation site 11 5 2 Preparatory work 11 5 3 Installation 12 6 Initial commissioning 15 7 Operation 16 7 1 Charging without user interface 16 7 2 Troubleshooting for char...

Page 4: ...arting any work Depending on the version of the wallbox there may be some discrepancies between the illustrations used in these instructions If device specific information is required this will be ind...

Page 5: ...r the site When using the wallboxes the ambient conditions and the chemical resistance of the housing material used aluminium stainless steel and sheet steel must be observed The manufacturer accepts...

Page 6: ...ng the wallboxes without the specified and recommended protective devices f Only operate wallboxes with intact residual current devices f Only operate wallboxes with an intact housing f Do not operate...

Page 7: ...erial to suit the weight of the device Observe the weight information on the nameplate f Do not add any additional weight to the wallboxes f Ensure that no persons can become suspended from the wallbo...

Page 8: ...ers and users of the wallbox The wallbox has a charging point with a charging socket The following device overview is an example the positions of the components may vary according to the equipment 3 1...

Page 9: ...equipment overview 2P1a 0X1 1 2P1c LTE Antenne 2P1a 1X1 1 0X0 0X0 PE 2A1 RJ45 S RJ45 2T1 0F1 1a 0F1 1 0Q1 1 0F0 2F1 0F1 0P1 1 2F1 0F1 0F1 1 0F1 1a 0P1 1 2A1 2T1 0Q1 1 0X0 PE Circuit breaker B 6 resid...

Page 10: ...onnected flashing slowly Charging system is reserved one vehicle connected flashing rapidly Charging system exchanging data with backend waiting for authorisation Blue flashing slowly Charging authori...

Page 11: ...it for damage f In the event of any damage to the wallbox contact the manufacturer or a qualified electrician f Select the anchor plugs and screws according to the ground f Strip the cable to the req...

Page 12: ...th live components f Observe the five safety rules defined according to DIN VDE 0105 4 f Ensure that the supply voltage is switched off f Ensure that power supply cable is electrically dead CAUTION Ri...

Page 13: ...Installation 13 DOK BEMO 11 20 Rev 01 PM 5 1 2 1 5 3 2 Installing the wallbox 6 1 2 1 7 2 1 2 1 2 1 Either hang in base or directly on the wall 8 1 2 1 9 1 2 1...

Page 14: ...Installation 14 DOK BEMO 11 20 Rev 01 PM 10 2 1 11 1 Connection illustration example 12 13 2 1 2...

Page 15: ...power supply cable is electrically dead f Carry out initial commissioning only with suitable and approved devices f Carry out initial commissioning according to the protocols of the standards DIN VDE...

Page 16: ...nd blue contact the operator 7 1 2 Starting charging f Briefly hold the RFID card up to the RFID card reader The charging plug will be locked into the charging socket and can no longer be withdrawn Th...

Page 17: ...slowly the charging system is connected to a vehicle or reserved f Hold the RFID card up to the RFID reader and authorise If the yellow LED flashes quickly the charging system is exchanging data with...

Page 18: ...nnected from the mains by a qualified electrician f Ensure that the supply voltage is switched off f Ensure that power supply cable is electrically dead f Do not open the enclosure during cleaning f E...

Page 19: ...qualified electrician according to the protocols of the standard DIN VDE 0100 600 and in accordance with country specific requirements and guidelines f DGUV regulation 3 inspection should be carried...

Page 20: ...ctive Cable insulation defective Faulty charging cable Have the charging infrastructure and charging cable checked by a qualified electrician Connected vehicle is defective Have the vehicle checked Ci...

Page 21: ...Wallbox is offline No connection to the backend system Connect to the backend system Electric vehicle requests fan Charging infrastructure does not support this request Charging not possible No LAN a...

Page 22: ...proven knowledge WARNING Death or risk of injury from electric shock due to contact with live components f Observe the five safety rules defined according to DIN VDE 0105 100 f Ensure that the supply...

Page 23: ...wallbox operators 12 1 Storage f Use sturdy packaging suitable for transport f Prevent the wallboxes from falling or tipping over f Store wallboxes in a dry and dust free place 12 2 Disposal f Comply...

Page 24: ...2013 5480 9601 fn 50Hz ln 32A Icc 10kA ACSEV Un 230 400V IP 54 DIN EN 61439 7 Gewicht 0 kg 1 2 3 5 4 6 7 8 11 10 13 12 14 9 1 Item number 8 Disposal information 2 Rated voltage 9 CE mark 3 Protection...

Page 25: ...ocket charging cable Type 2 Rated surge voltage 4 kV Rated isolation voltage 500 V Overvoltage category III Rated current of the switchgear assembly 16 A 32 A 32 A Conditional rated short circuit curr...

Page 26: ...residual current device 4 pole 40 0 03 A type A 1 x circuit breaker 3 pole C 32 A 1 x DC residual current detection 6 mA Electricity meter per charging point outlet point Type Bidirectional three pha...

Page 27: ...1 20 Rev 01 PM 14 2 smartEVO PRO 22 example 220 mm 367 5 mm 1100 mm 450 mm 350 mm 187 5 m m Height 450 mm Width 350 mm Depth 187 5 mm Weight 17 kg Counter Bidirectional three phase meter Operation ide...

Page 28: ...data 28 DOK BEMO 11 20 Rev 01 PM 14 3 Base optional can be fitted on one or both sides 1510 mm 365 mm 320 m m 273 m m 217 mm 345 mm 204 1 mm 217 115 45 273 Height 1510 mm Width 365 mm Depth 320 mm Wei...

Page 29: ...N 61439 1 2012 06 DIN EN 61439 7 2016 10 IEC 61851 1 Edition 3 0 IEC 62196 1 2011 IEC 62196 2 2011 DIN VDE 0100 500 ISO 15118 Eisenberg 10 11 2020 WALTHER WERKE Ferdinand Walther GmbH Kai Kaltho Adelh...

Page 30: ...Technical data 30 DOK BEMO 11 20 Rev 01 PM...

Page 31: ...Technical data 31 DOK BEMO 11 20 Rev 01 PM Installation instructions software updates available here walther werke de serviceportal...

Page 32: ...DOK BEMO 11 20 Rev 01 PM WALTHER WERKE Ferdinand Walther GmbH Ramsener Str 6 DE 67304 Eisenberg www walther werke de...

Reviews: