6.2 Before Startup
1.
Check the engine oil level. See
2.
Turn fuel valve on. Check the fuel level. See
3.
Check the engine air cleaner. See
4.
Review the Operating Safety.
5.
Clear the area of bystanders.
6.
Make sure each operator is trained and familiar with the set
up and operation of the wood chipper.
7.
Perform the Pre-operation Checklist.
8.
Survey the work site and place the chipper in a clear, level
work area. Park machine so that engine exhaust is not
blowing towards the operator.
9.
Leave the chipper attached to the tow vehicle if extra
stability is required. Set park brake on tow vehicle.
10.
Lower the front jack stand. Insert snap lock pin.
11.
Direct discharge chute away from the operator.
01089
Fig. 16 –
Machine setup properly
•
Discharge chute pointed to desired position, away from
operator and bystanders.
•
Upper housing securely closed.
•
All guards in place.
•
Jack leg supporting chipper or attached to tow vehicle.
•
Chipper located in clear, level area.
BXMT3209
Trailer Chipper-Shredder
Operating Instructions
23
Summary of Contents for BXMT Series
Page 1: ...OPERATOR S MANUAL TrailerChipper Shredder BXMT3209 Document Number Z97147_En Rev Mar 2020...
Page 46: ......
Page 47: ......
Page 48: ...www wallensteinequipment com...