background image

PC[1]8140G 

GAS PASTA COOKER (Single Tank - 40 Ltr)

 

NOTE: 

 

[1]: -  Model Options; 

 

 

- Standard. 

 

 

- Low Back. 

 

 

- Bold Front. 

 

 

LB 

- Low Back & Bold Front. 

 

A commercial heavy duty, gas fired high performance Pasta Cooker designed for pasta cooking  

commercial high production output, using LPG (Propane) or Natural Gas.  The boiling medium is  

contained within a heavy gauge stainless steel tank, heated by one infra red surface burner from 

beneath the tank. 

This Pasta Cooker features an Over Temperature Safety Cut Out System with Full Flame Failure Safe-

ty Controls. 

An open tank design to make cleaning a simple and easy task. 

 

This appliance can be fitted with the following optional accessories, (refer to the 'Replacement Parts 

List' for details). 

 

Plinth Kit. 

 

Basket 1/4, 165 x 165mm. 

 

Basket 1/4, 165 x 165mm. 

 

Basket 1/2, 320 x 165mm. 

 

 - Australia: 

 

 - New Zealand: 

 

 

 - UK Only: 

Category:   

II

2H3P. 

Flue Type:   

A

1. 

 

NOTE: (*) 

Measure  burner  operating  pressure  at  upper  test  point  (Supply  Pressure)  on  gas  control  valve  

located  behind  control  panel,  this  is  to  be  carried  out  with  burner  operating  at 

High  Flame

’ 

 

setting.  Refer to 

Gas Conversion and Specification

’ 

Section for further details. 

Input Rating (N.H.G.C.) 

46 MJ/hr 

47 MJ/hr 

Supply Pressure 

1.13 - 3.40 kPa 

2.75 - 4.50 kPa 

Burner Operating Pressure (*) 

0.92 kPa 

2.6 kPa 

Gas Connection 

¾” BSP Male 

Input Rating (N.H.G.C.) 

46 MJ/hr 

47 MJ/hr 

Supply Pressure 

1.13 - 3.40 kPa 

2.75 - 4.50 kPa 

Burner Operating Pressure (*) 

0.92 kPa 

2.6 kPa 

Gas Connection 

¾” BSP Male 

 

Nominal 

Reduced 

Pilot 

Nominal 

Reduced 

Pilot 

Heat Input (nett) 

12.0 kW 

5.4 kW 

320W 

12.5 kW 

6.2 kW 

320W 

Gas Rate 

1.27 m

3

/hr  0.42 m

3

/hr  0.03 kg/hr  0.97 kg/hr  0.48 kg/hr  0.02 kg/hr 

Supply Pressure 

20 mbar

 

37 mbar 

Burner Operating Pressure (*) 

27.7 mbar 

9.5 mbar

 

Gas Connection 

3

/

4

” BSP Male

 

Summary of Contents for PCB8140G

Page 1: ...I n s t a l l a t i o n a n d O p e r a t i o n M a n u a l Gas Pasta Cooker PC8140G PCL8140G PCB8140G PCLB8140G 230008 20 For use in GB IE...

Page 2: ...0 337 963 Customer Service tel 1800 335 315 fax 1800 350 281 CANADA Serve Canada Web www servecanada com E Mail info servecanada com Sales tel 800 551 8795 Toll Free Service tel 800 263 1455 Toll Free...

Page 3: ...on Requirements Unpacking Location Clearances Assembly Gas Connection Water Connection Drainage Connection Commissioning Operation Guide Description of Controls Before Use Filling the Tank Lighting Pi...

Page 4: ...adapting appliance to conditions for use in that country GREAT CARE MUST BE TAKEN BY THE OPERATOR TO USE THE EQUIPMENT SAFELY TO GUARD IT AGAINST RISK OF FIRE THE APPLIANCE MUST NOT BE LEFT ON UNATTE...

Page 5: ...t 1 4 165 x 165mm Basket 1 2 320 x 165mm Australia New Zealand UK Only Category II2H3P Flue Type A1 NOTE Measure burner operating pressure at upper test point Supply Pressure on gas control valve loca...

Page 6: ...ion point is located 152mm from left hand side 36mm from rear of appliance 124mm from floor and is entered from beneath appliance An optional rear connection is available Connection is 3 4 BSP male A...

Page 7: ...5...

Page 8: ...manufacturer are only to be adjusted by an authorised service agent They are not to be adjusted by the installation person Remove all packaging and transit protection from appliance including all prot...

Page 9: ...following minimum installation clearances are to be adhered to This model is delivered completely assembled Ensure that the adjustable feet are securely attached NOTE This appliance is fitted with adj...

Page 10: ...sible NOTE Gas pressure regulator provided with this appliance is convertible between Natural Gas and LPG as shown in Gas Conversion Section in this manual Ensure regulator is converted to correct gas...

Page 11: ...boiling water Drain connection is R1 BSP drain overflow The following commissioning checks must be carried out before pasta cooker is handed over for use to ensure that unit operates correctly and ope...

Page 12: ...ning A commercial heavy duty gas fired pasta cooker using an infra red burner system Available in single model type This model is fitted with single main burner and pilot burner and is controlled by a...

Page 13: ...of water supply nozzle that just causes water to continually flow out of overflow This method provides Maintained water level for cooking Skimming or flushing effect to prevent cooking water becoming...

Page 14: ...gulated between High Flame and Low Flame position to regulate cooking temperature 3 It will take approximately 30 minutes to heat water in tank from 20 C to 100 C IMPORTANT THE USE OF ROCK SALT IS NOT...

Page 15: ...appliance DO NOT use any chloric or bleaching detergents to clean appliance Ensure that any detergent or cleaning material has been completely removed after each cleaning DO NOT use saline or sulphuri...

Page 16: ...l using a damp cloth lightly moistened with a solution of mild detergent and hot water Dry the control panel thoroughly using a dry clean cloth 5 At the end of each day or at end of each shift Clean t...

Page 17: ...l valve spindles and can be removed when cleaning the control panel b Baked on deposits or discolouration may require a good quality stainless steel cleaner or stainless steel wool Always apply cleane...

Page 18: ...ks out satis but problem still persists Gas control valve is defective and needs replacement Call service provider Pilot Burner delay in ignition of main burners Check operating pressure as shown in I...

Page 19: ...17 PC8140G Pasta Cooker...

Page 20: ...in burner injectors and replace with correct size injectors as shown in Gas Specifications Table 1 Remove the following Gas supply tube to pilot burner NOTE Appliances fitted with piezo igniter electr...

Page 21: ...gas connections for leakage using soapy water or other gas detecting equipment 2 Carry out a Commissioning check of appliance as shown in Installation Section of this manual 3 Ensure any adjustments...

Page 22: ...mm 1 90mm Pilot Burner Injectors 0 62 0 35 Low Fire Screw 1 55mm 1 55mm High Fire Screw Fully Out c c w Fully Out c c w Supply Pressure 1 13 3 40 kPa 2 75 4 50 kPa Burner Operating Pressure 0 92 kPa 2...

Page 23: ...odels can only be converted between Nat Gas LP Gas and Butane but not Town Gas Refer to Gas Conversion and Specifications section in this manual for further details Main Burner Injectors 3 10mm 1 80mm...

Page 24: ...Water Valve 018095 Piezo H T Lead 227508 Piezo Ignitor 022575 Burner Kit General 238674 Pasta Basket LH 1 6 165 x 125mm 238819 Pasta Basket RH 1 6 165 x 125mm 229707 Pasta Cooker Basket Drain Tray 22...

Page 25: ......

Reviews: