COMMISSIONING
6.1
TRAINING OF ASSEMBLY/COMMISSIONING PERSONNEL
The assembly and commissioning personnel must have the technical skills to safely
commission the device.
When assembling, commissioning and carrying out all work, read and follow the
operating manuals and safety regulations for the additionally required system
components.
A skilled person must check to ensure that the device is in a reliable state after it is installed
and commissioned.
6.2
STORAGE CONDITIONS
Until the point of assembly, the device must be stored in a dry location, free from vibrations
and with a minimum of dust. The device must be stored in closed rooms.
The air temperature at the storage location must be between -20 °C and +60 °C (-4 °F and
+140 °F).
The relative air humidity at the storage location must be between 10 and 95% (without
condensation).
6.3
INSTALLATION CONDITIONS
The air temperature at the installation site must be in a range between 0 °C and 40 °C (32
°F and 104 °F).
The relative air humidity at the installation site must be between 10 and 95% (without
condensation).
6.4
TRANSPORTATION
The high-speed rotary atomizer TOPFINISH Bell 1S can be moved manually. Take care that
the bell is not damaged.