4
VERSION 01/2021
ORDER NUMBER DOC2422004
TOPFINISH Bell 1S ECH
Materials of Paint-wetted Parts
Connections on Valve Block - 1-Paint
Connections at Transition Piece
Connections on Control Cabinet RBC 1E (Single-Paint Valve Block)
Training of Assembly/Commissioning Personnel
Air Quality, Air Quantity and Air Pressure
Typical Electrostatic Spraying System
Setting up Stationary Electrostatic Systems
Assembly of High-Speed Rotary Atomizer on Reciprocator
Ventilation of the Spray Booth
Operating Instructions for Safe Operation
Verifying a Safe Operational Condition
Training the Operating Personnel
Pressure Relief/Work Interruption
For Internal Charging and Use of Solvent-Based Paints
Conversion from External to Internal Charging