50
PEM-X1
OPERATING MANUAL
VERSION 09/2012
ORDER NUMBER DOC 2326020
S
e
c
tion
T
y
pe of inspec
tion
Requir
emen
ts
Inspec
tion
by
T
y
pe of inspec
tion
Inspec
tion
in
ter
v
al
4
M
easur
es t
o
take if c
onduc
tiv
e
components ar
e insuffi
ciently
g
rounded
If
suffi
cient g
rounding of c
onduc
tiv
e
par
ts cannot be ensur
ed
, their
dischar
ge ener
gy must not ex
ceed
the permissible value
.
BP
ME/SÜ
M
easur
ement of dischar
ge ener
gy
.
W
eek
ly
5
R
esistanc
e t
o
g
round of w
o
rk
piec
e's locating point
T
he r
esistanc
e t
o
g
round of ev
er
y
w
o
rk piec
e's locating point must not
ex
ceed 1 megaohm (measur
ement
v
oltage must be 1000
V
).
T
he desig
n
of the w
o
rk piec
e r
e
ceiv
er must
ensur
e that the adapt
ers r
emain
g
rounded during c
o
ating
.
BP
ME/SÜ
M
easur
e r
esistanc
e t
o
g
round
(w
ork piec
e r
e
ceiv
er - g
round
pot
ential) max. 1 MOhm @ 1000
V
.
W
eek
ly
Ke
y
:
HE = M
anufac
tur
er
A
G
= Emplo
y
e
r
BP = C
apable person
BSB = F
ir
e
saf
et
y eng
ineer
EFK = Elec
trician
UP =
T
rained person
FU = F
unc
tion inspec
tion
ME = M
easur
ement
OP = Standar
d inspec
tion
SI =
V
isual inspec
tion
SÜ = C
o
ntinuous inspec
tion
TP =
Technical inspec
tion