Installing and connecting the control box
PerfectView SWITCH200VTO
EN
22
6
Installing and connecting the control box
6.1
Tools required
For
installation and assembly
, you will need the following tools:
Measuring ruler (fig.
4
4, page 4)
Centre punch (fig.
4
5, page 4)
Hammer (fig.
4
6, page 4)
Drill bit set (fig.
4
7, page 4)
Electric drill (fig.
4
8, page 4)
Screwdriver (fig.
4
9, page 4)
To establish and test the
electrical connection
, the following tools are required:
Diode test lamp (fig.
4
1, page 4) or voltmeter (fig.
4
2, page 4)
Insulating tape
Heat shrinking sleeve
Hot air blower (fig.
4
10, page 4)
Crimping tool (fig.
4
11, page 4)
Soldering iron (optional) (fig.
4
12, page 4)
Solder (optional) (fig.
4
13, page 4)
Cable bushing sleeves (optional)
To
fasten the cables
you may require additional cable binders.
6.2
Mounting the control box
The control is supplied ready for installation.
➤
Install the control box in a location
protected from water
near the monitor, preferably
under the dashboard.
Make sure you consider the length of the cable.
➤
Attach the control box using the supplied screws.
Summary of Contents for Switch200VTO
Page 3: ...PerfectView SWITCH200VTO 3 1 2 1 2 3...
Page 4: ...PerfectView SWITCH200VTO 4 1 4 8 11 12 13 9 10 5 6 7 2 3 4...
Page 118: ...PerfectView SWITCH200VTO RU 118 1 5 3 5 1 3 2 A 30 15 31 L R...
Page 119: ...PerfectView SWITCH200VTO RU 119 31 A...
Page 120: ...PerfectView SWITCH200VTO RU 120 A 3 4 SWITCH200VTO 9102200156 WAECO 1 3 1 1 9102200156 2 1 1...
Page 121: ...PerfectView SWITCH200VTO RU 121 5 SWITCH200VTO WAECO Reverse Trigger 1 12 32...