EN
Operation
AirConServiceCenter
96
8.7.1
Recovery phase
1. Enter the preferred settings and press
ENTER
to confirm.
2. If
“Rec/Recycling phase”
has been selected, enter the preferred
waiting time for the pressure increase (standard is 5 min.) in the
following menu and press
ENTER
to confirm, otherwise continue
with chapter “Vacuum process” on page 96.
I
8.7.2
Vacuum process
1. Enter the preferred settings and press
ENTER
to confirm.
2. If
“Vacuum phase”
has been selected, enter the preferred vacuum
time (standard is 20 min.), otherwise continue with chapter “Filling
process” on page 97.
3. Use the cursor key
to enter the vacuum phase time.
4. Press
ENTER
to confirm both settings.
I
Rec/Recycling
Yes
phase?
No
ENTER-OK STOP-EXIT
Pressure increase
Test time
min.
5
ENTER-OK STOP-EXIT
NOTE
The waiting time ensures that any residual refrigerant vaporises and
can then be extracted. The vaporising residual refrigerant triggers an
increase in pressure.
Vacuum phase
Yes
No
ENTER-OK STOP-EXIT
Vacuum time
min.
20
Leak Test
min.
4
ENTER-OK STOP-EXIT
NOTE
The air conditioning system is drained completely by the vacuum pump.
This is used to remove any remaining carrier gases or moisture, and to
prepare the air conditioning system for the filling process.
Summary of Contents for ASC1300G
Page 2: ......
Page 243: ...RU 243 AirConServiceCenter 1 2 A I ENTER Short selection 1 2 3 1 2 3 1 249 250 7 A E...
Page 256: ...RU AirConServiceCenter 256 7 7 1 20 17 18 19 2 20 3 ASC2300G ASC3000G 257 19 18 17 20...
Page 264: ...RU AirConServiceCenter 264 I 8 2 2 1 STOP ENTER USER CODE WRONG CODE Max Mustermann...
Page 281: ...RU 281 AirConServiceCenter 4 20 17 18 19 ENTER 5 17 19 18 20 6 STOP 19 18 17 20...
Page 293: ...RU 293 AirConServiceCenter 10 10 1 I 10 2 10 3 AirConServiceCenter M...
Page 297: ...RU 297 AirConServiceCenter Error 11 Error 12 10 C Error 51 USB USB USB FAT32 Error 60 Error 62...