EN
93
BMW 2500G
Operation
10. Decide whether a UV medium should be added when filling up or
not.
The standard filling quantity is 7 ml. This quantity is subject to
change (see chapter “Editing default values” on page 86).
Press
ENTER
to confirm.
11. Use the cursor keys
or
to select whether the air conditioning
system has two connections (high pressure and low pressure) or
one connection (high pressure or low pressure).
Press
ENTER
to confirm.
12. Select whether after the filling process a trial run of the air condition-
ing unit should be carried out or not.
Press
ENTER
to confirm.
✓
The fully automatic air conditioning service is started.
✓
After the air conditioning service has finished, you will be prompted to
disconnect the hoses (
11
) and (
12
) of the AirCon Service Center from
the vehicle air conditioning system.
13. Disconnect the service hoses (
11
) and (
12
) and press
ENTER
to
confirm.
The service hoses will now be drained. The device is then ready for
further use.
14. Put the valve caps of the vehicle air conditioning system back on the
connections.
WARNING !
Yes
UV-Tracer injection
No
phase?
HP/LP PORT
HP PORT
LP PORT
ENTER-OK STOP-EXIT
A/C System test
Yes
at the end?
No
WaecoBMW2500G_OPM_4445102371_EMEA(de-en-es-fr-ru)_202x-xx-xx.book Seite 93 Freitag, 30. Oktober 2020 6:49 18