
F i n a l s h u t d ow n o F t h e loa d e r / d ec o m m i ssi o n i n g
234
FINAL SHUTDOWN OF THE LOADER / DECOMMISSIONING
13
Should you no longer plan to use the loader as intended,
make sure that it is shut down, i.e. decommissioned, and
disposed of according to the valid regulations.
Before disposing of the loader:
Observe all safety procedures regarding shutdown of
•
the loader.
Make sure that the loader cannot be operated from the
•
time of shutdown to further disposal.
Make sure that no environmentally hazardous operating
•
fluids or fuel escape and that the machine poses no other
dangers in the place where it is standing.
Protect the loader against unauthorized use. Close all
•
openings (doors, windows, engine enclosure) and secure
the loader as described in Section 9, page 137 »Secur-
ing the loader«.
Attach all the safety devices.
•
Eliminate leaks on the engine, reservoirs and hydraulic
•
system.
Remove the battery.
•
Store the loader in a place protected against access by
•
unauthorized persons.
eNVIRONmeNTAl NOTe
Avoid environmental damage. Do not allow oil and
waste containing oil to spill on the ground or get
into bodies of water!
Dispose of different materials and operating fluids/
auxiliary materials separately and in an ecologically
sound manner.
Summary of Contents for WL 50
Page 1: ...Operator s Manual Wheel Loader WL 50 www wackerneuson com...
Page 2: ...December 08 Edition...
Page 46: ...TECHNICAL DATA 44 Dimensions 3 4 Dimensions Fig 11...
Page 103: ...Operating and operation 101 WL50 Fig 46 Switch for differen tial lock 1 12V 1...
Page 123: ...Operating and operation 121 WL50...
Page 134: ...Towing and transporting 132 Fig 66 Tying down the loader...
Page 243: ...Appendix 241 WL50 For personal notes...
Page 253: ...List of figures 251 WL50...